My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2010 0719
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0719
>
8F Consent 2010 0719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2010 5:14:19 PM
Creation date
7/15/2010 5:14:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/19/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0719
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0719
Reso 2010-096
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~>, <br />PROJECT TITLE: Bancroft Avenue Street Rehabilitation Protect <br />PROJEGT NO.: 09-160-38-319 <br />BID NO.: 09-10.028 <br />BID SUMMARY <br />BID OPENING EN(iINEER'3 ESTIMATE Bay Ctiiea Paving & Grading, Inc. Granke Construction Company Guerre Construction Group <br />DATE: Wednesday, July 7, 2010 Date Approved: xxlxx/xxxx 5029 Forni Drive P. O. Box 50085 984 Memorex Drive <br />TIME: 11:00 AM Prepared by: KL Concord, CA 94520 Watsonville, CA 95077-5085 Santa Clara, CA 85050 <br />LOCATION: City Clerk Phone: 925-687-8666 Phone: 831-724-1011 Phone: 408-279-2027 <br /> Fax:925-687-2122 Fax:831-768-4021 Fax:408-279-2044 <br />ITEM <br />tJO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br />13 1 LS Reinstall Lighted Crosswalk at $7,500.00 $7,500.00 $25,725.00 $25,725.00 $17,000.00 $17,000.00 $16,860.00 $16,860.00 <br /> Jefferson Elementary Afler <br /> Paving Operations Per Detail 1, <br /> Shoat 14 <br />14 1 LS Potholing (Locate Underground $6,000.00 $8,000.00 $8,000,00 $8,000.00 $7,000.00 $7,000.00 $6,000.00 $6,000.00 <br /> Utilities} <br />TOTAL BASE BID: $838,767.80 $841,378.38 $872,980.00 $714,872.10 "" <br />SUBCONTRACTORS: Griffin Soil, Statewide Safety, St. Griffin Soil, STI Trucking, Chrisp Griffin Soil, Chrisp Company, San <br /> Francis Electric, ABSL Company Company, Schoika Jose Signal Electric, Statewide <br /> Construction, St. Francis Safety. <br /> Electric <br />SECURITIES: 10% Bid Bond 10°Yo Bfd Bond 10°/b Bid Bond <br />NOTES: "" Math Error Corrected <br />Reviewed by: ~~ <br />K Le, Pro ct Manager <br />Reviewed bya <br />A e Osakwe, Senior Engineer <br />Date: ~` ?/~, <br />Date:17~~~~ //yl <br />Bid Summary.xlsx Page 4 of 4 Pdnted 7/7/2070 (~ 1:16 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.