My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2010 0719
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0719
>
8H Consent 2010 0719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2010 5:16:11 PM
Creation date
7/15/2010 5:16:11 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/19/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0719
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0719
Reso 2010-098
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br /> BID OPENING ENGINEER'S ESTIMATE Guerra Constuction Group Galedrige Construction, Inc. McNabb Construction, Inc. <br /> DATE: Thursday, July 8, 2010 Date Approved: 984 Memorex Drive P. O. Box 427 3286 Gloria Terrace <br /> TIME: 11:00 AM Prepared by: NNC Santa Clara, CA 95050 Alviso, CA 95002 Lafayette, CA 94549 <br />LOCATION: City Clerk Phone:408-279-2027 Phone:408-946-7782 Phone:925-935-4200 <br /> Fax:408-279-2044 Fax:408-946-7971 Fax:925-952-4600 <br />ITEM <br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br />5A 424 SY Emulsion Aggregate Slurry $5.00 $2,120.00 $7.00 $2,968.00 $6.75 $2,862.00 $2.10 $890.40 <br />6A 0 LF Irrigation Sleeves 12" $2.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />7A O LF Irrigation Sleeves 4" $2.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />8A 0 LF 4" Sewer Line (Marina Only) $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />9A 600 LF Headerboard $0.00 $7.50 $4,500.00 $10.00 $6,000.00 $4.90 $2,940.00 <br /> TOTAL BID ALTERNATE NO. 1: $38,035.90 $41,365.55 $52,300.50 $45,740.00 <br /> <br /> TOTAL BASE BID: $374,131.27 $400,374.20 $413,186.37 $437,723.00 <br /> TOTAL BID ALTERNATE NO. 1: $38,035.90 $41,365.55 $52,300.50 $45,740.00 <br /> TOTAL;81" $4'12;16Tf7 `' $441,739.75 ' 5465,4$6:87 $483,4133.00 <br /> SUBCONTRACTORS: None Bond Blacktop Durant Paving Rentals <br /> SECURITIES: 10% Bid Bond 10% Bid Bond 10% Bid Bond <br /> NOTES: <br />Reviewed by: ~ Date: <br />N~ I Nor a Castelino, Project Manager <br />Reviewed by: ~ Date: <br />tine Osakwe, Senior Engineer <br />~~~~i~ <br />~~ <br />Bid Summary with Alternates.xls Page 2 of 4 Printed 7/812010 @ 4:09 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.