Laserfiche WebLink
-~ APPENDIX BUILDING STANDARDS ADMINISTRATIVE COD <br />(Part 1, Title 24, C.C.R.) <br />Appendix H <br />Sample of Semimonthly Report <br />SAMPLE OF INSPECTOR'S SEMIMONTHLY REPORT <br />To & made on 1st and 15th of each month <br />Period from December i to December 15, 1986 <br />Application Na . <br />MR )OHnt DOE Arehfteet <br />Pasadena, Caflfornfa <br />Subject: <br />De~trt SIA: <br />Following b my report on the progress of the above job: <br />The fanrufation of the East Wing is casspk:te <br />Forms for the foundations of the Library 5eetioo arc ready for the pouring of eoo- <br />crcte Trenches for the tooth wail footings were bwered one foot as directed by <br />fames Wibon, 5trncturel EngirKer. <br />Eanwtlas arc complete and part of the forms arc in pbue For the West Wing. <br />Thirty percent of the euavatiots and backfUl has been rompieted <br />Reinforeing is en pbux for fire faotiag of the brick waU of the arcade <br />Where forms have been shripped Eton the concrete aiready poured the surfaces <br />show good workmanship. <br />Pregrca of work is s{ow but n progressing ss foe as can be expected with the class <br />of Lbor that we Gave. <br />Change Orders Number 1 and 2 Fuve been received and have been called to the <br />attmtias of the Superintendent. <br />Very tntly yours, <br />(Signed) RlcxAnD Row. Itsspector <br />123 Camira Road <br />Compton Heights <br />Copks <br />1 copy to (enforcement agency) <br />I copy to Engineer <br />36 <br />L~3 of ~~- <br />