Laserfiche WebLink
., • • <br />.' <br />XV. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and <br />each page of construction drawings shall be stamped/sealed and signed by the licensed <br />professional responsible for the report/design preparation. The stamp/seal shall be in a <br />block entitled "Seal and Signature of Registered Professional with report/design <br />responsibility" as per sample below. <br />Seal and Signature of Registered Professional with <br />report/design responsibility <br />Exhibit D <br />6/12/95 rev; 5/20/97 rev (Word 6.0) <br />AGRE\EXHIBITD.DOC <br />Page 7 of 7 <br />amt 1 <br />