Laserfiche WebLink
,+ <br />EXHIBIT A <br />SCOPE OF SERVICES <br />1. UNDERSTANDING. The City plans to construct a new fire station at 14903 Catalina St. <br />San Leandro, CA. The building is to include wood roof framing, CMU walls, a concrete slab on <br />grade sub-floor, electrical, mechanical, and plumbing. systems. Site work includes earth moving, <br />new driveways, parking areas, landscaping, sidewalk, signage, .fuel. storage, emergency <br />generator, and site drainage. Plans and specifications for the projects have .been prepared by <br />CJW Architecture ("Architect"). <br />The City plans to enter into a separate contract with. ~ a contractor experienced in construction <br />("General Contractor") who will furnish all labor, materialsy and equipment required to build the <br />project. The City plans to enter into a separate contract' with a company experienced. in <br />construction inspection ("Special Inspector") who will: furnish all Gabor, materials,. and equipment <br />required to fulfill the special inspection requirements as shown:on'the plans.and specifications. <br />The City has entered into another separate contract with an individual ("Projeet.Inspector'.'). who <br />will furnish all labor, materials, and equipment required to fulfill >the project inspector: <br />requirements as shown on the plans and specifications , <br />This contract is for construction review and construction .administration support: by the Architect <br />as detailed below. <br />2. SCOPE OF WORK. <br />Provide services listed below for the duration of the project. Time of construction is 205 <br />working days, normal hours of construction are lam to:6pm. , <br />a. Observation by Architect and Registered Engineer <br />Contractor shall perform the construction observation duties pursuant to the provisions of <br />Title 24 of the California Code of Regulations and Health and Safety Code Section 16021_. <br />Contractor shall provide all actions, inspections, and reports by the Civil Engineer, <br />Structural Engineer, Mechanical Engineer, Electrical Engineer, Landscape Architect and <br />CJW Architecture which are required in Contract Document Section 01410, as issued with <br />ASI-2. <br />b. Construction Phase Services <br />i. Field Observation -Provide field observation services as required to fulfill the <br />requirements of (a) above. <br />ii. Meetings -Attend weekly meetings during construction phase. <br />Exhibit A <br />6/12/95 <br />Page 1 of 2 <br />FIRE STATION 11 - CATALINA <br />