My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 CJW Architecture (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 CJW Architecture (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2010 5:01:05 PM
Creation date
7/19/2010 3:56:15 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/19/2001
Retention
PERM
Document Relationships
Reso 2001-195
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,+ <br />EXHIBIT A <br />SCOPE OF SERVICES <br />1. UNDERSTANDING. The City plans to construct a new fire station at 14903 Catalina St. <br />San Leandro, CA. The building is to include wood roof framing, CMU walls, a concrete slab on <br />grade sub-floor, electrical, mechanical, and plumbing. systems. Site work includes earth moving, <br />new driveways, parking areas, landscaping, sidewalk, signage, .fuel. storage, emergency <br />generator, and site drainage. Plans and specifications for the projects have .been prepared by <br />CJW Architecture ("Architect"). <br />The City plans to enter into a separate contract with. ~ a contractor experienced in construction <br />("General Contractor") who will furnish all labor, materialsy and equipment required to build the <br />project. The City plans to enter into a separate contract' with a company experienced. in <br />construction inspection ("Special Inspector") who will: furnish all Gabor, materials,. and equipment <br />required to fulfill the special inspection requirements as shown:on'the plans.and specifications. <br />The City has entered into another separate contract with an individual ("Projeet.Inspector'.'). who <br />will furnish all labor, materials, and equipment required to fulfill >the project inspector: <br />requirements as shown on the plans and specifications , <br />This contract is for construction review and construction .administration support: by the Architect <br />as detailed below. <br />2. SCOPE OF WORK. <br />Provide services listed below for the duration of the project. Time of construction is 205 <br />working days, normal hours of construction are lam to:6pm. , <br />a. Observation by Architect and Registered Engineer <br />Contractor shall perform the construction observation duties pursuant to the provisions of <br />Title 24 of the California Code of Regulations and Health and Safety Code Section 16021_. <br />Contractor shall provide all actions, inspections, and reports by the Civil Engineer, <br />Structural Engineer, Mechanical Engineer, Electrical Engineer, Landscape Architect and <br />CJW Architecture which are required in Contract Document Section 01410, as issued with <br />ASI-2. <br />b. Construction Phase Services <br />i. Field Observation -Provide field observation services as required to fulfill the <br />requirements of (a) above. <br />ii. Meetings -Attend weekly meetings during construction phase. <br />Exhibit A <br />6/12/95 <br />Page 1 of 2 <br />FIRE STATION 11 - CATALINA <br />
The URL can be used to link to this page
Your browser does not support the video tag.