Laserfiche WebLink
14. A project fire flow of 2,000 , Prior to issuance of a building permit, the fire flow shall be Alameda County Fire• Prior to issuance of <br />gallons per minute (gpm) will tested and an adequate fire flow of at least 2,000 gpm be Department buildin <br />be required. achieved. If an adequate flow is not available, the applicant shall g pennit. <br />include measures to the satisfaction of the Alameda County Fire <br />