My WebLink
|
Help
|
About
|
Sign Out
Home
RDA Reso 2000-004
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2000
>
RDA Reso 2000-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2010 4:07:57 PM
Creation date
7/20/2010 4:52:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
2/22/2000
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />IMPACTS OF PROPOSED PROJECTS <br />Project Description <br />The proposed project consists of a total of approximately 180,000 square feet of office space at <br />buildout. The proposed project is located north of Davis Street between San Leandro Boulevard and <br />Carpentier Street. Local access to the proposed project will .eventually be provided via two <br />driveways on San Leandro Boulevard and one driveway on Carpentier Street. The project site plan is <br />shown in Figure 3. <br />Trip Generation <br />The proposed project is expected to generate 1,982 daily trips, 281 a.m. peak hour trips and 265 p.m. <br />peak hour trips. The trip generation assumptions for the project are based on information contained <br />in Trip Generation, Sixth Edition, published by the Institute of Transportation Engineers. Table II <br />illustrates the estimated trip generation for the proposed project. <br />Table II <br />Project Trip Generation <br /> <br />Use Size Daily A.M. Peak Hour P.M. Peak Hour <br /> Rate Trips Rate In:Out In Out Total Rate In:Out In Out Total <br />Office 180 ksf 1 1.01 1,982 1.56 88:12 247 34 281 1.49 17:83 45 223 265 <br />Notes: Rate Source, Ti•ip Generation, Institute of Transportation Engineers, Sixth Edition, 1997. <br />ksf = 1.000 square feet <br />Trip Distribution and Assignment <br />Project trip distribution assumptions were developed based on existing travel patterns and knowledge <br />of the study area. Tlie trip distribution assumptions are: <br />• 45 percent would travel on Davis Street to and from the west. <br />• 30 percent would travel on Davis Street to and from the east. <br />• 5 percent would travel on San Leandro Boulevard to and from the north. <br />• 5 percent would travel on Williams Street and Marina Boulevard to and from the west <br />via Davis Street and/or local arterials and collectors. <br />• 5 percent would travel on San Leandro Boulevard to and from the south. <br />• 5 percent would travel on East 14th Street to and from the south. <br />• 5 percent would travel on East 14th Street to and from the north. <br />__~~1 <br />San Leandro Creekside Plaza Business Park Traffic Study Page 8 <br />TJKM Transportation Consultants October 26, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.