My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2000-022
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2000
>
Reso 2000-022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2010 10:51:27 AM
Creation date
7/21/2010 9:12:26 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
2/22/2000
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. The applicant is also responsible for ensuring that all contractors and subcontractors are aware <br />of and implement all storm water quality measures. Failure to comply with the approved <br />construction BMPs shall result in the issuance of correction notices, citations and/or a project <br />stop order. <br />16. Until such time as all construction for the development has been completed to the satisfaction <br />of the City Engineer, the Applicant shall provide current Erosion and Sediment Control Plans, <br />and amended Storm Water Pollution Prevention Plans (SWPPPs) for all portions of the site <br />where construction is ongoing. Said Plans shall be submitted to the City Engineer for review <br />and approval on or before September 1 of each calendar year, and shall be fully implemented <br />on or before October 15 of each calendar year. <br />17. The Urban Runoff Clean Water Program requires that all runoff must be treated to remove <br />sediment and water borne pollutants prior to discharge into a public facility. If filtration type <br />catch basins are used, it is the responsibility of the Applicant/Owner to regularly inspect and <br />maintain the filtration systems. Such inspection and maintenance shall include replacing the <br />inlet filters a minimum of two times each calendar year. <br />18. All on-site storm drain inlets must be labeled "No Dumping -Drains to Bay" or equivalent <br />using methods approved by the City or County. All on-site storm drains must be cleaned at <br />least twice a year and immediately prior to the rainy season. Additional cleaning may be <br />required by the City Engineer. <br />19. On-site EBMUD street fire hydrants with minimum fire flow and spacing in accordance with <br />the San Leandro Uniform Code will be required. Prior to installation, the Fire Department shall <br />approve the location of the fire hydrants. A water supply shall be in place prior to combustible <br />material being moved into any phase of the project. <br />20. Design review fees, development impact fees, permit fees, inspection fees, and any other fees <br />charged by the City or other reviewing agencies for the review, approval, permitting and <br />inspection of the above listed public improvements shall be paid by the Applicant. <br />21. Remove existing brick wall and the tree at the entryway of Parcel 2 to provide egress and <br />ingress access. <br />22. Remove and replacgany broken sidewalk, curb and gutter along the frontage of the property. <br />Uchenna <br />F2:\COUNCIL\FEB22\7569 PARCEL MAP ENGR REPORT <br />Date <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.