My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 1997-003
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
1997
>
Ord 1997-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2010 1:48:47 PM
Creation date
8/31/2010 1:48:43 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
3/3/1997
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 10 <br /> UNIT COST ESTIMATES <br /> Bikeway Facility Cost Per Milel <br /> Class III Bike Route: <br /> • signing, minor surface repair $1,000 <br /> • rural road widening (32" shoulder) <br /> Class II Bike Lane: <br /> • signing, striping, minor surface repair $20,000 <br /> • signing, striping, road widening $50,000 <br /> Class I Bike Path: <br /> • rehabilitate or upgrade existing path $50,000 <br /> • construct asphalt path on existing level embankment, $150,000 • <br /> or right of way, includes signing, striping <br /> • construct asphalt path on graded right of way, $230,000 <br /> requires drainage and new sub -base <br /> • construct asphalt path within ungraded corridor, $350,000 <br /> some retaining walls required <br /> Support Facilities: <br /> Signal Loop Detectors $2,500 /intersection <br /> Undercrossing $150,000 - $350,000 <br /> At -Grade Crossing <br /> • signing, striping $5,000 <br /> • signing, striping, signals $65,000 <br /> Landscaping <br /> • irrigated $350,000 - $600,000 /mile <br /> • non - irrigated $150,000 - $300,000 /mile <br /> Bridge (8' wide) $60 - $100 square foot <br /> Fencing $20 linear foot <br /> Railroad Crossing $125,000 <br /> Emergency Cellular Phone (installed) $3,500 <br /> 1 The cost estimates were based on actual costs experienced in various California <br /> communities. They are estimated only; more detailed estimates should be <br /> developed after preliminary engineering. <br /> 2 Contribution for roadway improvement projects (approximately 20 %) of total <br /> cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.