Laserfiche WebLink
E. 14 St Striping R Pedestrian Improvement <br /> P&S and Call for Bids 2 September 7, 2010 <br /> • Policy 18.02 — Capital Improvements — Identify capital improvements and other measures <br /> that improve the safety of bicyclists, pedestrians, and motor vehicles on San Leandro streets <br /> • Policy 18.05 — Funding — Pursue grants for the improvement of pedestrian, bicycle, and <br /> motor vehicle safety <br /> • Policy 19.01 — Street and Building Design — Promote the design of streets and buildings that <br /> make San Leandro's streets more attractive and inviting for pedestrians, bicyclists, and public <br /> transit users. New development should promote the use of these modes of transportation by <br /> including amenities such as sidewalks, bike lockers, and bus shelters <br /> • Policy 20.05 — Coordination with Caltrans — Coordinate local transportation planning <br /> programs and improvement projects with Caltrans. Integrate the Caltrans' Tier 2 highway <br /> system into the local transportation system to the maximum extent feasible <br /> Environmental Review <br /> California Environmental Quality Act (CEQA) exemption has been filed with Alameda County, <br /> pursuant to Section 15301 "Existing Facilities ". <br /> Board /Commission Findings <br /> The Planning Commission conducted a public hearing on November 10, 2005 regarding the <br /> proposed restriping. <br /> Summary Of Public Outreach Efforts <br /> • September 29, 2004 -open house and workshop for E. 14 Street Striping project (first <br /> questionnaire sent with the meeting notice) <br /> • March 3, 2005- revised questionnaire mailed <br /> • November 10, 2005 -a public hearing was held at the Planning Commission meeting <br /> • April 28, 2009 — Neighborhood meeting for residents near the roundabout project for <br /> selection of final design <br /> • March 17, 2010 — City of Oakland Encroachment Permit for installation of Advanced <br /> Warning Signs for the Roundabout <br /> Fiscal Impact <br /> • The total cost of the East 14 Street Striping Pedestrian Improvements (West Broadmoor <br /> Boulevard to Hays Street) and the Semi- Roundabout project is $175,000, including staff time <br /> • Construction costs are estimated at $125.000 <br />