Laserfiche WebLink
15. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br /> administrator, the first page of a technical report, first page of design specifications, and each <br /> page of construction drawings shall be stamped /sealed and signed by the licensed professional <br /> responsible for the report/design preparation. The stamp /seal shall be in a block entitled "Seal <br /> and Signature of Registered Professional with report/design responsibility" as per sample below. <br /> " - - ‘OFESS/ <br /> ±Seg2ProfessIona1 with <br /> .report/design : "�d' <br /> Ext; „/ q #.Z <br /> 47 C!VI L � <br /> e ° e CA' 1f0 °W - . <br /> Exhibit D Page 6 of 6 <br /> 6/12/95 WPCP Belt Filter Press Replacement <br /> 5/20/97 rev. <br />