My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2000 CJW Architecture
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2000
>
Agmt 2000 CJW Architecture
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2010 3:17:00 PM
Creation date
9/7/2010 3:16:59 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/3/2000
Retention
PERM
Document Relationships
Reso 2000-044
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Provide civil, structural, mechanical, plumbing, & electrical schematic system <br /> overlays. <br /> 4. Provide elevation style studies & material /color studies for chosen style for both a <br /> single company station located on Catalina St. and a double company station <br /> located near the corner of Williams St and Doolittle Drive. Architect will attend <br /> meeting with Facilities Committee to receive input on elevation styles. Architect <br /> will attend follow -up meeting to receive input and selection from three (3) <br /> elevations to be provided for each Station. <br /> 5. Deliverable documents, will include: <br /> • Architectural site plan <br /> • Site plan with preliminary civil engineering <br /> • Landscape plan <br /> • Finalized floor plan <br /> • Elevations <br /> • Site overlays for mechanical, plumbing, fire protection, landscape, and <br /> electrical <br /> • Plan overlays for structural, mechanical, plumbing, fire protection, landscape, <br /> and electrical <br /> • Exterior colors and materials (board) <br /> • Building sketches <br /> • Schematic construction cost estimate <br /> • City Council presentation documents <br /> • Planning Commission presentation documents <br /> • Planning Department submittal <br /> • Revised documents addressing comments <br /> • One set of reproducible vellums <br /> • One set of full size prints and one set of reduced prints <br /> 6. Preliminary selection of major building systems and construction materials <br /> 7. Meetings will include: <br /> • Project Kick -off Meeting (1) <br /> • Elevation Style Study w/ Facilities Committee (1) <br /> • Elevation Selection Study w/ Facilities Committee (1) <br /> • SD Progress Meeting at Architects office (1) <br /> • SD Review Meeting (1) <br /> B. Design Development <br /> 1. Design development will be based on the approved schematic design package and <br /> budget. Documents will fix and describe the size and character of the project as to <br /> architectural. furniture, finishes, colors. stntctural. mechanical, plumbing, <br /> landscape. and electrical system. <br /> Exhibit A Page 2 of 5 <br /> 6/12/95 Fire Station/Catalina <br />
The URL can be used to link to this page
Your browser does not support the video tag.