Laserfiche WebLink
the City Engineer for review and approval on or before September 1 of each calendar year, and shall <br /> be fully implemented on or before October 15 of each calendar year. <br /> E. WATER SYSTEM <br /> 1. Prior to approval of the Final Map for the project, the Subdivider shall submit signed agreements <br /> with EBMUD, for the construction of the proposed water main connections. <br /> 2. EBMUD street fire hydrants with minimum fire flow and spacing in accordance with the San <br /> Leandro Uniforni Code will be required. Prior to installation, the City Engineer and the Fire <br /> Department shall approve the number and location of the fire hydrants <br /> F. SANITARY SEWER SYSTEM <br /> I. Sanitary sewer service to the project is proposed by connections to City facilities. Prior to the <br /> approval of the Final Map, the Subdivider shall evaluate the capacity of the existing sanitary sewer <br /> system and shall identify any capacity deficiencies and required improvements to meet the needs of <br /> the project. All required improvements are subject to the review and approval of the City Engineer <br /> and shall be constructed as part of the Subdivision improvements. <br /> 2. City facilities proposed to be utilized by the project eventually flow to the existing sewers in Davis <br /> Street. The City's Sanitary Sewer System Capability Study and Master Plan (1995) has identified <br /> capacity deficiencies in the existing sewers in Davis Street. Prior to approval of the Final Map, <br /> Subdivider shall pay its fair share of the costs to upgrade the existing sewers in Davis Street and <br /> further downstream, as determined by the City Engineer. <br /> G. UNDERGROUNDING OF OVERHEAD UTILITIES <br /> 1. The Subdivider shall place all utility services for the project underground, including service <br /> connections to any existing overhead utilities. <br /> 2. Prior to approval of the Final Map, Subdivider shall satisfy the existing obligation on the property by <br /> reimbursing the City costs of undergrounding of overhead utilities along Estudillo Avenue, previously <br /> completed by the City, in accordance with the City's Underground Utility District Master Plan. <br /> H. FEES AND DEPOSITS <br /> 1. Design review fees, development impact fees, perniit fees, inspection fees, connection fees and any <br /> other fees charged by the City or other reviewing agencies for the review, approval, permitting and <br /> inspection of the above listed public improvements shall be paid by the Subdivider. <br /> 2. Prior to approval of the Final Map, Subdivider shall enter into a Subdivision Improvement Agreement <br /> for that Final Map and shall post security and insurance in the amounts and forms acceptable to the <br /> City Engineer. <br /> Final Map for TM 7133 <br /> 4/17/2000 Page 4 of 5 <br />