Laserfiche WebLink
(m) The Subdivider shall provide archaeological monitoring of all construction activities on the <br /> site. There shall be an archaeologist on site at all times during excavation/grading activity. <br /> (n) In the event that archaeological or historical resources are discovered during <br /> excavation/grading, work shall be suspended and a qualified archaeologist or historian shall be hired at <br /> Subdivider's expense to examine the findings and to recommend appropriate mitigation. Said mitigation <br /> shall be reviewed and approved by the Planning Commission and City Council. <br /> (o) All fill maurial imported to the project site shall be tested for toxicity. The applicant shall <br /> submit the results of such testing to the City. Fill material which has toxicity levels in excess of permissible <br /> local, state or federal levels shall not be used on the project site. <br /> (p) All metal fences and ancillary structures in the right -of -way and in close proximity to the <br /> transmission lines shall be grounded, in accordance with applicable specifications, to eliminate potential <br /> electric shocks. Appropriate cautionary sigming shall also be installed. <br /> CITY OF SAN LEANI)RO, a municipal <br /> corporation <br /> Dated: / S - o ° 13y: <br /> JOHN J. JERMANIS <br /> City Manager <br /> SCS Development Company, a California <br /> corporation I)13A Citation Homes Central <br /> Principal <br /> Dated: By: — <br /> Signature <br /> Stephen E. Schott <br /> Print name <br /> Vice President <br /> Title <br /> 110 TRACT MAP 7078 CIIERRY WOOD - PIIASE 1 &2 <br /> ABSTRACT OE SUBDIVISION IMPROVEM ENT AGREEMENT (PUBLIC IMPROVEMI Nrr)) <br /> CAM A P S Cr7078 \S U B I M P A G R P U I31.I C. DOC <br /> PAGE 16 OF 17 <br />