My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2010 0913
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0913
>
2A Work Session 2010 0913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2010 5:16:13 PM
Creation date
9/9/2010 5:12:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/13/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0913
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0913
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Encourage Auto Mall and /or regional commercial /retail development on underutilized <br />industrial properties along Marina Boulevard, consistent with the Special S- Overlay zoning <br />designation for Marina Boulevard. Assist in marketing the Auto Mall as feasible. <br />• Provide for the rehabilitation of commercial structures through the Commercial <br />Rehabilitation Program (forgivable loans to business and property owners). <br />• Facilitate design and financing to construct a new seismically safe four -story Estudillo - Callan <br />Parking Garage to provide additional parking to enable higher density development in the <br />downtown. <br />• Work with Joint Area property owners and business owners to create a Property Business <br />Improvement District (PBID) or a Community Benefit District (CBD) to fund the <br />continuation of services such as maintenance, security, parking management, marketing, etc. <br />• Support the continued undergrounding of utility lines along East 14th Street, converting <br />aerial utility services to underground service systems and upgrading street lighting. <br />• implementation of the streets cape-related recommendation of the East 14th Street South <br />Area Plan, including widening sidewalks, installing new street trees and street furniture, and <br />adding crosswalks and landscaped medians where appropriate to East 14th Street between <br />downtown and 150th Avenue. <br />• Reconfiguration and beautification of the busy East 14th Street /150th Avenue/Hesperian <br />Boulevard intersection. <br />• Continue redevelopment of Bayfair Center, specifically as it relates to implementation of the <br />Expansion Parcel Study for an underutilized 2.5 acre site currently leased to Bayfair Center for <br />surface parking. <br />As Table 5 on the next page makes clear, the Agency will not be in a position to initiate major projects <br />in the Joint Area in this Implementation Plan period. <br />Both scenarios below assume that Agency funding for downtown maintenance and security services will <br />not be required after 2011 -12. This assumption is contingent on formation of a business improvement <br />district. <br />San Leandro Redevelopment Agency <br />2010 -2014 Implementation Plan <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.