My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2010 0913
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0913
>
2A Work Session 2010 0913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2010 5:16:13 PM
Creation date
9/9/2010 5:12:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/13/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0913
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0913
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Construct Eden Road, currently a dirt road, to improve traffic circulation in the <br />Davis/Doolittle intersection area. <br />• Design and implement Phases III and IV of the Doolittle Drive streetscape enhancement <br />program (Phase III Davis to Marina and Phase IV Marina to Fairway). Doolittle Drive is a <br />gateway to Oakland Airport, the shoreline, and a busy artery through the City's industrial <br />district. <br />• Support new or significantly improved, larger I -880 interchanges at Marina Boulevard and <br />Davis Street to ease congestion and stimulate private investment in the project area by taking <br />better advantage of its strategic regional location. <br />• Provide for the rehabilitation of commercial structures through the Commercial <br />Rehabilitation Program, with a special focus on the MacArthur business district and the <br />Doolittle Drive and Marina Boulevard areas. <br />• Facilitate energy efficiency improvements to industrial plants and operations through the <br />Industrial Competitiveness Program which provides forgivable loans to improve energy <br />efficiency thereby making businesses more competitive. <br />• Implement Phase II of the MacArthur Boulevard Streetscape Master Plan (Phase II <br />Superior to Dutton). MacArthur Boulevard is a gateway to the City of Oakland, a thoroughfare, <br />and a busy neighborhood destination. <br />• Support the long -term viability of Westgate Center as both a regional retail center and a <br />technology- oriented business center. <br />• Assist in maintaining LINKS, the West San Leandro Shuttle Program to take workers to <br />and from work and the San Leandro BART Station. <br />• Attract new commercial and industrial uses that offer higher paying wages and /or add to <br />the city's financial base; encourage clustering of like uses in certain areas as appropriate. <br />+ Develop strategies to mitigate both auto and truck related traffic to reduce conflicts with <br />residential uses, while facilitating movement of goods. <br />+ Identify obsolete buildings and work with property owners to modernize or remove them, <br />creating jobs and stimulating investment. <br />• Assist with assembling parcels for development sites, particularly underutilized property on <br />MacArthur Boulevard and inadequately sized industrial parcels in West San Leandro. <br />Table 8 on the next page includes estimates that tax increment is projected to grow steadily in the 2010- <br />2014 Implementation Plan period, allowing business assistance projects to be funded. In Fiscal Years <br />2009 -10 and 2010 -11 the WSL Project Area is budgeted to pay $1.3 million in SERAF for the other two <br />project areas, which are burdened with obligations. Those payments will be structured as a loan. The <br />San Leandro Redevelopment Agency <br />2010 -2014 Implementation Plan <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.