My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2000-080
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2000
>
Reso 2000-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2010 4:32:37 PM
Creation date
9/10/2010 4:32:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
6/5/2000
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATRATIVE CODE 2000 -01 <br /> Proposed <br /> TITLE 6 FINANCE <br /> Chapter 4 Fees <br /> §6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative <br /> Code (SLAC) or the general laws of the State of California. <br /> Description Current Fee I Reference <br /> DEVELOPMENT SERVICES DEPARTMENT- Building Regulations Division <br /> (5) Energy Conservation: for all buildings 15% of Bu ilding Permit Fee <br /> subject to the Califomia Energy <br /> Commission's conservation regulations <br /> 3. Electrical Permit <br /> a. Issuance Fee $22.00 plus the amount shown for each electrical item <br /> involved in the work, as shown below <br /> b. Minimum fee $48.00 plus each item installed, as shown below <br /> Circuits: Installation, replacedment or alterantion of each electrical circuit (includes related outlets, switches, <br /> receptacle and lighting fixtures): <br /> 1 to 20 ampere circuit $ 7.50 <br /> 21 to 30 ampere circuit 8.25 <br /> 31 to 40 ampere circuit 8.50 <br /> 41 to 50 ampere circuit 9.25 <br /> 51 to 70 ampere circuit 10.00 <br /> 71 to 100 ampere circuit 12.50 <br /> 101 to 200 ampere circuit 18.25 <br /> Over 200 ampere capacity 18.50 PLUS $5.50 for each additional 100 ampere <br /> capacity or fraction thereof <br /> Trolly and plug -in type busways, per linear foot $ .35 <br /> Lighting fixtures, brackets, pendants, cord drops, $ .85 <br /> outlets, receptacles, switches and other lamp holding <br /> devices, each on existing circuits <br /> 5/15/00 6 Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.