Laserfiche WebLink
Wood fascia at edge of overhang <br /> Misc. trim at doors and windows <br /> BUILDING IMPROVEMENTS <br /> New Plaster Parapet Wall <br /> Demolish and remove (E) sign wall at roof <br /> Remove partial roof <br /> Frame (N) 5' -0" high parapet wall with metal studs <br /> 4" studs, channel, at 16" o. c. <br /> Plywood sheathing <br /> Metal lath over building paper <br /> Exterior cement plaster <br /> Metal coping/flashing • <br /> Metal brace angles at S'-0" o. c. <br /> Sleepers at S' -0" o. c. <br /> Patch (E) roof at (N) work area <br /> Paint (N) parapet wall and metal coping <br /> Prime (N) bracing <br /> New Horizontal Metal Mesh Bands (4 total) <br /> Arched steel frame work (approximately 4' -0" high x 20' -0" wide) <br /> Metal Mesh <br /> Weld (N) assembly to (E) pipe columns <br /> Paint <br /> • <br /> ELECTRICAL / LIGHTING <br /> New Lighting at Parking Lots <br /> Remove (E) pole- mounted luminaires (2) <br /> New pole- mounted luminaires and mounting brackets (2) <br /> New decorative pole and pole- mounted luminaries (2) <br /> New Lighting at New Tenant Signs at Economy Market Parapet Walls <br /> New fixture junction boxes <br /> New conduit and connectors <br /> New light fixtures (10) <br /> The construction documents for each of these shopping centers will include the following: <br /> 1.0 CONSTRUCTION DOCUMENTS <br /> 1.1. Architectural Drawings <br /> 1.1.1 Cover Sheet <br /> A. Reference Site Plan /Key Plan <br /> EXHIBIT A Page 7 of 11 <br /> AGREIEXHIBITADOC (Word 6.0) <br />