My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2000 Sinclair Associates
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2000
>
Agmt 2000 Sinclair Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2010 4:14:09 PM
Creation date
9/15/2010 4:14:07 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/5/2000
Retention
PERM
Document Relationships
Reso 2000-127
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUILDING FINISHES <br /> Power -wash Existing Vertical Surfaces <br /> Wood siding <br /> Masonry walls (CMU) <br /> Windows /storefronts <br /> Brick walls <br /> Paint, Large Surfaces <br /> Masonry walls (CMU) <br /> Wood siding <br /> Paint, Trim /Detail Work <br /> Underside roof deck at covered walkway <br /> Metal roof /parapet coping cap <br /> Misc. trim at doors and windows <br /> Wood fascia/edge of overhang <br /> Brick/Tile Base at Walls <br /> Clean & repair existing to remain <br /> Install new brick/tile base at storefronts <br /> BUILDING IMPROVEMENTS <br /> New Vertical Elements (4 total) <br /> Demolish (E) concrete walk for (N) foundation <br /> Set (N) base plate and pour (N) conc. footing and curb <br /> Install new heavy gauge steel stud frame <br /> Install new metal mesh screen over frame (perforated metal panels) <br /> Paint (N) vertical elements <br /> New Horizontal Metal Mesh Signage Bands Along Existing Overhang <br /> Steel frame work <br /> Metal mesh screen (perforated metal panels) <br /> Bolt metal mesh screens to frame <br /> Paint <br /> ELECTRICAL / LIGHTING <br /> New/Increased Electrical Service, Distribution and Controls <br /> Increase capacity of existing service to building <br /> Install new panel board(s) and feeders <br /> Install new time switch, photoelectric cell for exterior lights <br /> EXHIBIT A Page 4 of 11 <br /> AGREIEXHIBITA.DOC (Word 6.0) <br />
The URL can be used to link to this page
Your browser does not support the video tag.