My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2010 0920
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0920
>
8F Consent 2010 0920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:21:52 PM
Creation date
9/16/2010 5:23:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/20/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0920
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0920
Reso 2010-120
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> Consultant shall conduct a constructability review and provide written comments to the City as described in <br /> the following tasks and within the schedule identified. <br /> Task 001 - Plans and Specification Review <br /> • Review the plans and specifications for general constructability and difficulty in <br /> construction. Review the plans and specifications for contradictions between each other. <br /> Review the plans and specifications for coordination between the design disciplines. <br /> Review the plans and specifications for ambiguities and possible omissions. <br /> Task 002 - Legal and Contractual Provisions <br /> • Review General Conditions for completeness and conformance with SRF requirements. <br /> Task 003 - Work Logic and Timeline <br /> • Review the construction sequencing logic and timeline to minimize change orders and <br /> disruptions to plant operations. <br /> • Review the project schedule developed by the designer. Review the specifications for <br /> inclusion of defined milestones and schedule constraints and record drawing requirements. <br /> Task 004 - Construction Provisions <br /> • Review that the specified temporary provisions are adequate for continuous plant <br /> operation during construction. <br /> • Review that the specified temporary provisions are satisfactory to allow for testing and <br /> start-up. <br /> • Review that the odor control provisions are satisfactory for containment of odors during <br /> construction, <br /> • Review that the design has considered provisions for the Contractor's access, storage <br /> and lay down areas. <br /> Task 005.0 & M Features <br /> • Review the design documents for inclusion of operational and maintenance friendly <br /> features <br /> Task 006 - Control Logic/ ElectricaV Instrumentation <br /> • Review control /logic strategies and instrumentation to confirm that new equipment <br /> functions properly <br /> • Review the equipment control diagrams for support of the specified operational strategies. <br /> Consulting Services Agreement between September 2010 <br /> City of San Leandro and Brown and Caldwell -- Exhibit A Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.