Laserfiche WebLink
Exhibit D2 <br /> VEGETATED SWALE INSPECTION AND MAINTENANCE CHECKLIST <br /> Alco Iron and Metal 2140 Davis St., San Leandro, CA 94577 <br /> Treatment Measure I.D. Number : Inspection Date: <br /> Inspector(s): Type of Inspection: ❑ Monthly ❑ End of Season <br /> ❑ After Heavy Runoff ❑ Other: <br /> Defect Conditions when Maintenance Comments (Describe Expected Results with <br /> Maintenance is Needed ? maintenance conducted and, if Maintenance <br /> Needed (Y /N) needed, pending maintenance. <br /> Note when maintenance will be <br /> complete.) <br /> Sediment Sediment Swale should allow water to flow evenly <br /> accumulation on accumulating near and drain freely towards outlet. There <br /> vegetation culverts, curbcuts, whould be no areas of standing water <br /> etc., and in channels when inflow has ceased. <br /> where it builds up to <br /> 3 inches at any spot, <br /> or if it covers <br /> vegetation <br /> Standing water Water standing in the No areas of standing water should remain <br /> swale, not draining after inflow has ceased. Grade improved; <br /> freely trash or sediment blockages removed. <br /> Constant When small amounts No eroded, muddy channel on the bottom. <br /> baseflow of water continually <br /> flow through the <br /> Swale, even in dry <br /> weather, a muddy, <br /> eroded channel may <br /> form. <br />