My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2010 1018
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 1018
>
8E Consent 2010 1018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2010 5:11:34 PM
Creation date
10/14/2010 5:29:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/18/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 1018
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 1018
MO 2010-039
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2010
Reso 2010-131
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
106.3 Examination of documents. <br /> The building official shall examine or cause to be examined the accompanying construction <br /> documents and shall ascertain by such examinations whether the construction indicated and <br /> described is in accordance with the requirements of this code and other pertinent laws or <br /> ordinances. <br /> 106.3.1 Approval of construction documents. <br /> When the building official issues a permit, the construction documents shall be approved, in <br /> writing or by stamp, as 'Reviewed for Code Compliance." One set of construction documents so <br /> reviewed shall be retained by the building official. The other set shall be returned to the <br /> applicant, shall be kept at the site of work and shall be open to inspection by the building official <br /> or a duly authorized representative. <br /> 106.3.2 Previous approvals. <br /> This code shall not require changes in the construction documents. construction or designated <br /> occupancy of a structure for which a lawful permit has been heretofore issued or otherwise <br /> lawfully authorized, and the construction of which has been pursued in good faith within 180 <br /> days after the effective date of this code and has not been abandoned. <br /> 106.3.3 Phased approval. <br /> The building official is authorized to issue a permit for the construction of foundations or any <br /> other part of a building or structure before the construction documents for the whole building or <br /> structure have been submitted. provided that adequate information and detailed statements have <br /> been filed complying with pertinent requirements of this code. The holder of such permit for the <br /> foundation or other parts of a building or structure shall proceed at the holder's own risk with the <br /> building operation and without assurance that a permit for the entire structure will be granted. <br /> 106.3.4 Design professional in responsible charge. <br /> 106.3.4.1 General. <br /> When it is required that documents be prepared by a registered design professional, the building <br /> official shall be authorized to require the owner to engage and designate on the building permit <br /> application a registered design professional who shall act as the registered design professional in <br /> responsible charge. If the circumstances require, the owner shall designate a substitute registered <br /> design professional in responsible charge who shall perform the duties required of the original <br /> registered design professional in responsible charge. The building official shall be notified in <br /> writing by the owner if the registered design professional in responsible charge is changed or is <br /> unable to continue to perform the duties. <br /> The registered design professional in responsible charge shall be responsible for reviewing and <br /> coordinating submittal documents prepared by others, including phased and deferred submittal <br /> items, for compatibility with the design of the building. <br /> Where structural observation is required by Section 1709, the statement of special inspections <br /> shall name the individual or firms who are to perform structural observation and describe the <br /> stages of construction at which structural observation is to occur (see also duties specified in <br /> Section 1704). <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.