Laserfiche WebLink
l urge <br /> lam • ' • DF SCRII l IOi \.OF ISSUE/. ° t - Unit . .. 1 riont) ! A1uddit iin ' Rirnu': - - <br /> # LOCATION, —ADDRESS . -•........".. - .:.-AS 111111:1 - ,-1 ROI'OSED- CORIt1.C'l'ION • • QI. ...WOES'' Cost i i'ntitl Crst . t No C' .. it Dater,-.. l Removed, <br /> 516 Door #159- 300 Estudillo Operating effort is 12 lbs. Adjust door operating effort to I Job $100 $100 2 FY2012- <br /> Women's Ave not exceed 5 lbs. 2014 <br /> Restroom <br /> 517 Women's 300 Estudillo Towel dispenser is mounted Lower dispensers to not exceed 2 Job $350 $700 2 FY 2012 - <br /> Restroom #159 Ave 40.5" AFF and soap dispenser is 40" AFF. 2014 • <br /> mounted 42" AFF. <br /> 518 Women's 300 Estudillo Sanitary napkin dispenser Recommend removal. I Job $100 $100 5 FY 2012 - <br /> Restroom #159 Ave requires grasping and twisting. 2014 <br /> 519 Women's 300 Estudillo U- shaped handle is not provided Provide U- shaped door hardware I Job $450 $450 2 FY 2012 - <br /> Restroom #I59 Ave on the back of the compartment on the back of the compartment 2014 <br /> door. door. <br /> 520 Women's 300 Estudillo Space from the wall to the Reposition water closet so that I Job $1,500 $1,500 2 FY 2012 - <br /> Restroom #159 Ave centerline of the water closet is the space from the wall to the 2014 <br /> 20". centerline of the water closet is <br /> 18" absolute. <br /> 521 Women's 300 Estudillo Space from the wall to the edge Provide 32" min. clear space I Job $1,500 $1,500 2 FY 2012 - <br /> Restroom #I59 Ave of the water closet is 15.5 ". between wall and the water 2014 <br /> closet. <br /> 522 Women's 300 Estudillo Flush control is not located on Relocate flush control on the I Job $1,000 $1,000 2 FY 2012 - <br /> Restroom #I59 Ave the wide side. wide side of the water closet. 2014 <br /> 523 Women's 300 Estudillo Compartment width is 42 ". Widen compartment to 60" min. I Job $1,500 $1,500 2 FY 2012 - <br /> Restroom #159 Ave 2014 <br /> 524 Women's 300 Estudillo Rear grab bar is not provided. Install rear grab bar. 1 Job $500 $500 2 FY 2012 - <br /> Restroom #159 Ave 2014 <br /> 525 Door #158 - 300 Estudillo Operating effort is 14 lbs. Adjust door operating effort to 1 Job $100 $100 2 FY 2012 - <br /> Men s Restroom Ave not exceed 5 lbs. 2014 <br /> 526 Men's Restroom 300 Estudillo Soap dispenser is 44" AFF. Lower dispenser to not exceed 1 Job $350 $350 2 FY 2012- <br /> #158 Ave 40" AFF. 2014 <br /> 527 Men's Restroom 300 Estudillo Pipes are not insulated. Insulate pipes. I Job $100 $100 2 FY 2012- <br /> #158 Ave 2014 <br /> 528 Men's Restroom 300 Estudillo Urinal is 21" (17" max) from the Install new urinal. 1 Job $3,500 $3,500 2 FY 2012- <br /> #158 Ave floor to the lip and urinal rim 2014 <br /> projects 9" (14" min) from the <br /> • wall. Flush control is mounted <br /> 48" (44" max) AFF. <br /> 529 Men's Restroom 300 Estudillo U- shaped handle is not provided Provide U- shaped door hardware I Job $450 $450 2 FY 2012- <br /> # 158 Ave on the back of the compartment on the back of the compartment 2014 <br /> • <br /> door. door. <br /> 530 Men's Restroom 300 Estudillo Compartment width is 42 ". Widen compartment to 60" min. 1 Job $1,500 $1,500 2 FY 2012- <br /> #158 Ave 2014 <br /> Appendices Page 14 <br /> • <br />