Laserfiche WebLink
1. National Fire Protection Association (NFPA) Standards. <br /> 2. National Electric Code (NEC) and applicable local Electric Code. <br /> 3. Underwriters Laboratories (UL) listing and labels. <br /> 4. UL 864 UUKL Smoke Control <br /> 5. UL 268 Smoke Detectors. <br /> 6. UL 916 Energy Management <br /> 7. NFPA 70 - National Electrical Code. <br /> 8. NFPA 90A - Standard For The Installation Of Air Conditioning And Ventilating <br /> Systems. <br /> 9. NFPA 92A and 92B Smoke Purge /Control Equipment. <br /> 10. Factory Mutual (FM). <br /> 11. American National Standards Institute (ANSI). <br /> 12. National Electric Manufacturer's Association (NEMA). <br /> 13. American Society of Mechanical Engineers (ASME). <br /> 14. American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE) <br /> [user note: add ASHRAE 62 IAQ as applicable]. <br /> 15. Air Movement and Control Association (AMCA). <br /> 16. Institute of Electrical and Electronic Engineers (IEEE). <br /> 17. American Standard Code for Information Interchange (ASCII). <br /> 18. Electronics Industries Association (EIA). <br /> 19. Occupational Safety and Health Administration (OSHA). <br /> 20. American Society for Testing and Materials (ASTM). <br /> 21. Federal Communications Commission (FCC) including Part 15, Radio Frequency <br /> Devices. <br /> 22. Americans Disability Act (ADA) <br /> 23. ANSI /EIA 909.1 -A -1999 (LonWorks) <br /> 24 ANSI /ASHRAE Standard 195 -2004 (BACnet) <br /> B. In the case of conflicts or discrepancies, the more stringent regulation shall apply. <br /> C. All work shall meet the approval of the Authorities Having Jurisdiction at the project site. <br /> 1.6 Submittals <br /> A. Shop Drawings, Product Data, and Samples <br /> 1. The BMS contractor shall submit a list of all shop drawings with submittals dates <br /> within 30 days of contract award. <br /> 2. Submittals shall be in defined packages. Each package shall be complete and shall <br /> only reference itself and previously submitted packages. The packages shall be as <br /> approved by the Architect and Engineer for Contract compliance. <br /> Non - Professional Services Agreement between November 1, 2010 <br /> City of San Leandro and Martin Industries, Inc., DBA Climatech Page 7 of 28 <br />