My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2010 1115
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 1115
>
3B Public Hearing 2010 1115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2010 9:36:14 AM
Creation date
11/10/2010 3:14:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/15/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 1105
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 1115
Ord 2010-013
(Reference)
Path:
\City Clerk\City Council\Ordinances\2010
Ord 2010-014
(Reference)
Path:
\City Clerk\City Council\Ordinances\2010
Ord 2010-015
(Reference)
Path:
\City Clerk\City Council\Ordinances\2010
Ord 2010-016
(Reference)
Path:
\City Clerk\City Council\Ordinances\2010
Ord 2010-017
(Reference)
Path:
\City Clerk\City Council\Ordinances\2010
Ord 2010-018
(Reference)
Path:
\City Clerk\City Council\Ordinances\2010
Ord 2010-019
(Reference)
Path:
\City Clerk\City Council\Ordinances\2010
Ord 2010-020
(Reference)
Path:
\City Clerk\City Council\Ordinances\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stages of construction at which structural observation is to occur (see also duties specified in <br />Section 1704). <br />106.3.4.2 Deferred submittals. <br />For the purposes of this section, deferred submittals are defined as those portions of the design <br />that are not submitted at the time of the application and that are to be submitted to the building <br />official within a specified period. <br />Deferral of any submittal items shall have the prior approval of the building official. The <br />registered design professional in responsible charge shall list the deferred submittals on the <br />construction documents for review by the building official. <br />Documents for deferred submittal items shall be submitted to the registered design professional <br />in responsible charge who shall review them and forward them to the building official with a <br />notation indicating that the deferred submittal documents have been reviewed and been found to <br />be in general conformance to the design of the building. The deferred submittal items shall not <br />be installed until the design and submittal documents have been approved by the building <br />official. <br />106.4 Amended construction documents. <br />Work shall be installed in accordance with the approved construction documents, and any <br />changes made during construction that are not in compliance with the approved construction <br />documents shall be resubmitted for approval as an amended set of construction documents. <br />106.5 Retention of construction documents. <br />One set of approved construction documents shall be retained by the building official for a <br />period of not less than 180 days from date of completion of the permitted work, or as required by <br />state or local laws. <br />SECTION 107 <br />TEMPORARY STRUCTURES AND USES <br />107.1 General. <br />The building official is authorized to issue a permit for temporary structures and temporary uses. <br />Such permits shall be limited as to time of service, but shall not be permitted for more than 180 <br />days. The building official is authorized to grant extensions for demonstrated cause. <br />107.2 Conformance. <br />Temporary structures and uses shall conform to the structural strength, fire safety, means of <br />egress, accessibility, light, ventilation and sanitary requirements of this code as necessary to <br />ensure public health, safety and general welfare. <br />ORDINANCE NO. 2010-013 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.