My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2010-147
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2010
>
Reso 2010-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2010 5:13:36 PM
Creation date
12/13/2010 5:13:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/6/2010
Retention
PERM
Document Relationships
8G Consent 2010 1206
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 1206
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN THE CITY COUNCIL OF THE CITY OF SAN LEANDRO <br /> RESOLUTION NO. 2010 - 147 <br /> RESOLUTION ADOPTING A PREQUALIFICATION PROCEDURE AS SPECIFIED IN PUBLIC <br /> CONTRACT CODE SECTION 20101 [d]; AUTFIORIZING THE CITY MANAGER TO PREPARE <br /> AND PUBLISH A PREQUALIFICATION QUESTIONNAIRE FOR THE INSTRUMENTATION AND <br /> PROCESS CONTROL SCOPE OF WORK; AND AUTHORIZING THE CITY MANAGER TO <br /> APPROVE THE LIST OF PREQUALIFIED CONTRACTORS TO PERFORM SAID SCOPE OF <br /> WORK FOR THE WATER POLLUTION CONTROL PLANT (WPCP) REHABILITATION <br /> PROJECT, PROJECT NO. 08- 593 -52 -239. <br /> Recitals <br /> WHEREAS, the City is planning the construction of significant public improvements to <br /> the Water Pollution Control Plant; and. <br /> WHEREAS, the instrumentation and control systems are critical components of the <br /> planned construction, requiring highly qualified and trained personnel to install said systems; <br /> and, <br /> WHEREAS, it is in the best interest of the City to limit the installation of instrumentation <br /> and control systems at the WPCP to only duly qualified contractors; and <br /> WHEREAS, the City is permitted under California Public Contract Code section <br /> 20101[d] to establish a prequalification procedure. <br /> NOW, THEREFORE. the City Council of the City of San Leandro does RESOLVE as <br /> follows: <br /> That the City Council hereby approves the preparation and use of a prequalification <br /> procedure for the purpose of prequalifying instrumentation and control system contractors for the <br /> WPCP Rehabilitation Project; and <br /> That the City Council hereby authorizes the City Manager to prepare all documents <br /> necessary to conduct a prequalification procedure for said contractors in accordance with state <br /> law; and <br /> That upon conclusion of the City's prequalification procedure and generation of a <br /> prequalified list of contractors to perform the required scope of work, the City Manager is <br /> authorized to approve the prequalification list for use in the contract documents for the WPCP <br /> Rehabilitation Project. <br /> Introduced by Councilmember Prola and passed and adopted this 6th day of December, <br /> 2010, by the following called vote: <br />
The URL can be used to link to this page
Your browser does not support the video tag.