Laserfiche WebLink
• <br /> o f SAN ���, East 14 Street Striping and Pedestrian <br /> A Improvements Project <br /> "c� Neighborhood Meeting and Comments <br /> CORP°RA -r o' 6 November 16, 2010 — 6:30 p.m. <br /> Helen Lawrence South Offices Conference Room <br /> 999 East 14` Street <br /> You are cordially invited to a neighborhood meeting on Tuesday, November 16 to update the community <br /> regarding this project before construction commences. The plan is to restripe East 14' Street between Hays <br /> Street and Georgia Way resulting in one southbound and two northbound travel lanes. The roadway <br /> configuration on East 14' Street north of Georgia Way will remain the same for the time being. <br /> The project is in response to community concerns about side- street access, pedestrian safety, and congestion at <br /> the East I4 Street /Dutton Avenue intersection. Numerous community meetings were conducted from <br /> September 2004 to April 2006. This community outreach allowed area residents and businesses to determine <br /> the best solution to their concerns: City Council approved the project plan in 2006. After an extended design <br /> and review process by Caltrans, the City of San Leandro is ready to start the project. However, we want to <br /> update the public about the project and address any questions and comments. <br /> Given that the project area is too large to be shown on letter sized paper, the attached plans reflect a portion of <br /> the project area showing typical sections on East 14 Street from north of Georgia Way and south of Dutton <br /> Avenue. Plan 41 is the existing condition and Plan #2 shows the condition after this project is completed. <br /> As many of you know, AC Transit's Bus Rapid Transit (BRT) project is continuing to go through the planning <br /> stages. If it moves forward, it will occur after 2015, and its proposed dedicated bus lanes on East 14' Street <br /> between Georgia Way and the Oakland/San Leandro City limits are compatible with the City's project. Please <br /> see Plan #3 showing the BRT and City projects combined. <br /> • <br /> All of these plans may be accessed online at the City of San Leandro's website. Go to <br /> http : / /www.sanleandro.org /depts/ transit /proiect/currproi2010.asp. You may also view the plans at City Hall. <br /> Displays are available for viewing from October 28 to November 23. They are located in the hallway adjacent <br /> to the Engineering and Transportation Department. These displays will also be shown at the November 1 6 i11 <br /> neighborhood meeting. <br /> After reviewing the plans, please complete the enclosed form to address your questions and continents and <br /> return it by November 23, 2010 by mail, fax, or at the. neighborhood meeting. You may also complete this <br /> survey online at http: / /www.sanl eandro .org /depts /transiUswveys /q and_c.asp. We appreciate your cooperation <br /> and participation in this important issue. <br /> City of San Leandro Contact: Reh -Lin Chen <br /> Engineering and Transportation Department Senior Transportation Engineer <br /> 835 East 14 Street rchen(alsanleandro.org <br /> San Leandro, 04 94577 Tel: (510) 577 -3438 <br /> Fax: (510) 577 -3294 <br />