Laserfiche WebLink
Bancroft Avenue Rehabilitation <br /> • Limits: 138th Avenue to 148 Avenue <br /> • Reconstruction using cement stabilized base <br /> • ARRA Funds (Reallocated from Washington Avenue <br /> savings), Measure B and General funds <br /> • Construction: <br /> t <br /> — Construction is Complete <br /> a ' <br /> — Working with PG &E to <br /> Lower 3 Gas Mains <br /> F . i • <br /> ts <br /> .4 <br />