My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2010369944
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2010
>
Inst 2010369944
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2011 3:51:18 PM
Creation date
1/5/2011 3:51:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2010
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION / MAINTENANCE RESPONSIBILITY FOR BMPS <br /> In the following tables the BMP inspection and maintenance responsible party is identified. These tables <br /> also describe the maintenance activity and the frequency for the inspection. Records of maintenance <br /> and inspections shall be kept by the Property Owner / Site Manager and should be made available to <br /> government agencies. <br /> Responsible party details are: <br /> Property Owner <br /> Name: Barry Skolnick <br /> Title: Area Vice President <br /> Company Waste Management of Alameda County, Inc. <br /> Address 172 98 Avenue, Oakland, CA 94603 <br /> Phone 1510) 613 -2112 <br /> 0 & M Manger <br /> Name: Jack Isola <br /> Title: Senior District Manager <br /> Company Waste Management of Alameda County, Inc. <br /> Address 2615 Davis Street, San Leandro, CA 94577 <br /> Phone (510} 563-4202 <br /> During construction, and until such time as a transfer of ownership is completed Waste Management of <br /> Alameda County will serve as the responsible parties for installation, inspection, implementation, and <br /> maintenance of the structural and non - structural BMPs outlined in this Operation and Maintenance Plan <br /> Maintenance will be conducted in accordance with Table 1— BMP Maintenance Responsibility. All <br /> structural BMPs are to be inspected, cleaned and repaired, as needed, before the beginning of each <br /> storm season (between August 1" and October 1 "), after every major storm (precipitation greater than <br /> 0.75 inches) and at least once per month. All debris and water pollutants removed from structural BMPs <br /> during clean out shall be contained and disposed of properly. <br /> For a review of the BMPs deemed as routine for each usage, see Section 2.3 of the site's Storm Water <br /> Pollution Prevention Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.