Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF SERVICES <br /> Project Background <br /> The East 14th Street/Hesperian Boulevard /150th Avenue Street Improvements involves the construction of <br /> various lane reconfigurations, signal modifications to improve the overall Level -Of- Service for the <br /> intersections and to enhance safety for motorists, pedestrians and transit riders by acquiring the triangle <br /> shaped parcel in the center of this intersection for widening of existing roadways. <br /> The consulting services covered under this contract comprise of work related to remediation of <br /> contaminated soil at 14901 East 14th Street. <br /> Scope of Work <br /> Task 1— Site Remediation <br /> Based on the findings of historic environmental assessments, the tasks outlined below discuss activities <br /> and costs associated with the implementation of Ninyo & Moore's Remedial Action Plan (RAP), dated <br /> January 10, 2008. The scope of work associated and to be performed by the Consultant is the following: <br /> Subtask 1.1: Project Coordination <br /> Project set -up, pre -construction site visits, updated document reviews, and client and regulatory <br /> meetings. <br /> Subtask 1.2: Preparation of Bid Documents and Remediation Costs <br /> Construction plans, specifications and estimates (PS &E) will be prepared for inclusion in the bid <br /> package for the City. The PS &E package is subjected to review and shall be approved by the City. <br /> The specifications will include: 1) Summary of Work, which will include a description of planned site <br /> use, a list of site documents, a list of contractor plans, and a brief summary of contractor activities; <br /> 2) Move In, Site Preparation, Site Maintenance. Move Out, which will include a description of <br /> contractor actions consist of establishing work zones, clearing the site, establishing health and <br /> safety procedures, establishing storm water management and, performing the final site cleanup and <br /> final demobilization; 3) Dust Control, which will include a description of contractor actions relating <br /> to dust control associated with excavation, backfill and compaction activities, truck traffic (on and <br /> off site), loading and decontamination of equipment and transportation vehicles, and exposed site <br /> soil and soil stockpiles; 4) Earthwork, which will consist of providing direction for handling clean <br /> and contaminated soil, truck loading, backfill, final grading, and compaction quality assurance as <br /> required by Standard Specifications and as directed by the Consultant; and 5) Transportation and <br /> Disposal, which will include instructions for transporting and disposing of excavated contaminated <br /> soil. <br /> Consulting Services Agreement between 14901 East 14th Street Site Remediation <br /> City of San Leandro and Ninyo & Moore -- Exhibit A Page 15 of 25 <br />