Laserfiche WebLink
• <br /> XIV.USE OF RECYCLED PRODUCTS. Contractors shall prepare and submit all reports, written studies and other <br /> printed material on recycled paper to the extent it is available at equal or less cost than virgin paper. <br /> XV. PROFESSIONAL SEAL. Where applicable in the determination of the contract administrator, the first <br /> page of a technical report, first page of design specifications, and each page of construction drawings shall be <br /> stamped/sealed and signed by the licensed professional responsible for the report/design preparation. The <br /> stamp /seal shall be in a block entitled "Seal and Signature of Registered Professional with report/design <br /> responsibility". <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br /> Standard Contractual Services Agreement Attachment A <br />