Laserfiche WebLink
San Leandro Boulevard- <br /> �'' BART Pedestrian <br /> A Interface Plan <br /> Station Access and Connectivity Plan <br /> • Traffic and vehicular access n <br /> • On- street parking 0 <br /> • Pedestrian crossings 3 <br /> • Safety assessment 3 <br /> • Transit access and operations c <br /> • Wayfinding <br /> Conceptual Design of San Leandro Boulevard *4( <br /> • Evaluation of concepts <br /> • Streetscape and urban design concepts 0 <br /> • Traffic study <br /> • BART transit center concepts CD <br /> 3 <br /> CD <br /> Infrastructure Development And Financing r-r <br /> Strategy (Implementation Plan) <br /> • Preliminary engineering design <br /> • Financing plan _ A SAN I <br />