Laserfiche WebLink
1/11/2011 . <br /> Bancroft Avenue Rehabilitation <br /> • Limits: 138t Avenue to 148t Avenue <br /> • Reconstruction using cement stabilized base <br /> • ARRA Funds (Reallocated from Washington Avenue <br /> and Aladdin Avenue savings), Measure B and <br /> General funds <br /> • Construction is Complete _ <br /> • PG &E to Lower 3 Gas Mains <br /> it -'- <br /> I <br /> Park Pathways <br /> • Measure WW Grant Funded <br /> • Replacement of Asphalt �,, _.:..�......� <br /> Pathways at Several City Parks: <br /> • Marina, Washington Manor, <br /> Halcyon, Stenzel, Warden <br /> and Thrasher <br /> Marina Park <br /> • Asphalt Construction Complete <br /> 111100110 <br /> • Slurry to be completed in the <br /> Spring when material becomes <br /> available and weather improves <br /> Halcyon Park <br /> 2 <br />