My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2011 0208
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2011 0208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2011 4:56:46 PM
Creation date
3/3/2011 4:55:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
2/8/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0307
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0307
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> 2/8/2011 <br /> Private Sewer Lateral Connections <br /> Facilities and Transportation Committee <br /> February 8, 2011 <br /> • <br /> Sanitary Sewer Lateral Reconnection <br /> • At the May 2010 Facilities Committee meeting, staff first <br /> introduced the issue of sewer lateral reconnections <br /> • Admin Code adopted by Council on December 20, 2010 <br /> • Some sanitary sewer lines were constructed in backyards <br /> without easements Since some lines have had homes and <br /> other structures built over them <br /> • The lateral pipeline from the City's sewer main is owned and <br /> maintained by the property owner <br /> • Problems requiring relocation of main sewer lines <br /> • When a mainline is relocated the lateral piping and building <br /> connection require modification <br /> • Additions to the Administrative Code to consistently respond <br /> to these conditions <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.