Laserfiche WebLink
EXHIBIT "B" <br /> Construction and Installation Oblations <br /> Timeframe for Installation: Fixed Traffic Camera Safety Improvement Program: <br /> Redflex will have each specified approach installed and activated in phases in accordance <br /> with an implementation plan to be mutually agreed to by Redflex Traffic Systems and the <br /> Customer. <br /> In order to provide the Customer with timely completion of the Traffic Camera Safety <br /> Improvement Program, Redflex requires that the Customer assist with obtaining timely <br /> approval of permit requests. The Customer acknowledges the importance of the safety <br /> program and undertakes that in order to keep the project on schedule the Customer will <br /> provide engineering review(s) of Redflex permit requests and all documentation in a <br /> timely manner. <br /> 1. Redflex Obligations. Redflex shall do or cause to be done each of the following (in <br /> each case, unless otherwise stated below, at Redflex's sole expense): <br /> 1.1. Appoint the Redflex Project Manager and a project implementation team; <br /> 1.2. Request current "as- built" electronic engineering drawings for the Designated <br /> Intersection Approaches (the "Drawings ") from the city traffic engineer; <br /> 1.3. Develop and submit to the Customer for approval construction and installation <br /> specifications in reasonable detail for the Designated Intersection Approaches, <br /> including but not limited to specifications for all radar sensors, pavement loops, <br /> electrical connections and traffic controller connections, as required; and <br /> 1.4. Seek approval from the relevant Governmental Authorities having authority or <br /> jurisdiction over the construction and installation specifications for the <br /> Designated Intersection Approaches (collectively, the "Approvals "), which will <br /> include compliance with City permit applications. <br /> 1.5. Finalize the acquisition of the Approvals; <br /> 1.6. Develop the Violation Criteria in consultation with the Customer; <br /> 1.7. Develop the Enforcement Documentation for approval by the Customer, which <br /> approval shall not be unreasonably withheld; <br /> 1.8. Complete the installation and testing of all necessary Equipment, including <br /> hardware and software, at the Designated Intersection Approaches. <br /> 1.9. Cause an electrical sub - contractor to complete all reasonably necessary electrical <br /> work at the Designated Intersection Approaches, including but not limited to the <br /> installation of all related Equipment and other detection sensors, poles, cabling, <br /> telecommunications equipment and wiring, which work shall be performed in <br /> compliance with all applicable local, state and federal laws and regulations; <br /> 1.10. Install and test the functionality of the Designated Intersection Approaches <br /> with the Redflex System and establish fully operational Violation processing <br /> capability with the Redflex System; <br /> 1.11. Implement the use of the Redflex System at each of the Designated <br /> Intersection Approaches; <br /> 1.12. Deliver the Materials to the Customer; and <br /> 1.13. Citation processing and citation issuance /re- issuance for Authorized <br /> Violations; <br /> 22 <br />