Laserfiche WebLink
3/8/2011 <br /> 2011 Street Projects <br /> Summary <br /> • Reconstruction / Rehabilitation - 37,793 SY <br /> • Asphalt Rubber Double Chip Seal - 51,521 SY <br /> • Asphalt Rubber Cape Seal - 7,587 SY <br /> • Microsurfacing - 11,794 SY <br /> • Slurry Seal - 73,664 SY <br /> Curb Ramp Summary <br /> 114 Total Curb Ramp Locations <br /> 103 New Curb Ramps or replacement of prior standard ramps. <br /> • Installation at street corners — 88 Locations <br /> • At T- intersections, Parking Not Impacted - 4 Locations <br /> • At T- intersections. Parking Impacted - 11 Locations <br /> Add Truncated Dome Panels <br /> • Truncated dome panels will be installed on existing ramps sloped per <br /> current ADA standards, but lack truncated domes - 11 Locations <br /> Infeasible Ramp Locations <br /> • At certain T- intersections, the third non - corner ramp cannot be built <br /> due to conflict with driveways or lack of a safe street crossing (e.g <br /> Marina Blvd at Orchard Ave) - 5 Locations <br /> 2 <br />