Laserfiche WebLink
3/8/2011 <br /> Schedule <br /> • Some ramps will be added to sidewalk <br /> program for construction in April and May <br /> • Street project construction to be staggered <br /> through Summer <br /> — Marina Blvd <br /> — Slurry Sealing <br /> — Overlay / Rehabilitation <br /> Astor Drive and View Dr <br /> Annual Overlay/Rehab 2010 -11 <br /> Future ramp at NW quadrant <br /> 7 <br /> Ramp not feasible at SW quadrant <br /> 7 <br />