Laserfiche WebLink
LSA ASSOCIATES. INC. CEQA INITIAL STUDY /MITIGATED NEGATIVE DECLARATION <br /> MARCH 2011 PREDA STREET PIPE BRIDGES UPGRADE <br /> SAN LEANDRO, CALIFORNIA <br /> SUMMARY INFORMATION <br /> 1) Project Title: <br /> Preda Street Pipe Bridges Upgrade <br /> 2) Lead Agency Name and Address: <br /> City of San Leandro <br /> Community Development Department <br /> 835 E. 14 Street <br /> San Leandro, CA 94577 <br /> 3) Contact Person and Phone Number: <br /> • <br /> Phil Millenbah. Senior Planner <br /> (510) 577 -3327 <br /> 4) Project Location: <br /> The project site is located at an existing sewer pipe crossing over San Leandro Creek adjacent to <br /> Alder Creek Circle, near Preda Street in the City of San Leandro. The project site occupies <br /> portions of three or four separate parcels, including a parcel owned by Ryland Homes <br /> Development (APN 075- 0229 - 006 -00). a parcel owned by the Alameda Flood Control District <br /> (APN 075 - 0229 - 001 -00), and one or both of two parcels owned by the Standard Pacific Railroad <br /> Company (APN 075 -0155- 007 -00 and/or APN 075- 0207 - 016 -00). Figures 1 and 2 illustrate the <br /> regional and project site locations, respectively. <br /> 5) Project Sponsor's Name and Address: <br /> City of San Leandro <br /> Department of Engineering and Transportation <br /> 835 E. 14 Street <br /> San Leandro, CA 94577 <br /> 6) General Plan Designation(s): <br /> Resource Conservation <br /> 7) Zoning: <br /> Open Space <br /> 8) Description of the Project: <br /> The City of San Leandro proposes to replace two existing sewer pipes and rehabilitate two <br /> supporting pipe bridges that span San Leandro Creek, to maintain flow capacity and improve pipe <br /> performance during future seismic and /or flood events (Figure 3). Proposed activities involve the <br /> following: removal of existing pipes. excavation associated with installation of pipe restraints, <br /> upgrades to the existing support bridges and installation of new infrastructure including new <br /> pipes and pipe restraints. The proposed project was determined based on'factors such as cost, <br /> durability, maintenance, and minimizing environmental impacts. Based on the results of these <br /> P:\EGI080110EQA\Preda_FINAL IS- MND.doc (03/28 /II) 2 <br />