Laserfiche WebLink
BID SUMMARY <br /> PROJECT TITLE: San Leandro Dog Walking Paris • <br /> PROJECT NO.: 12236314 <br /> BID NO.: 10. 11.007 <br /> BID OPENING ENGINEER'S ESTIMATE Ranis Construction 8 Electric <br /> DATE: Tuesday, April 12, 2011 Date Approved: 3/21/2011 171 Miramar Avenue <br /> TIME: 3:00 PM Prepared by: MJG San Francisco, CA 94112 <br /> LOCATION: City Clerk Phone: 416 -469 -5800 <br /> Fax: 415.469 -5844 <br /> ITEM • <br /> NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST <br /> 1 1 LS Mobilization (ind. general 517,702.00 517,702.00 526,000.00 526,000.00 <br /> conditions) <br /> 2 700 LF Install 6' chain link fence, ind 535.00 524,500.00 $35.65 324,955.00 <br /> gates/footings <br /> 3 900 LF Install 4' chain link fence, ind $40.00 536,000.00 $21.10 518,990.00 <br /> gates/footings <br /> 4 320 CY AB Access Road, fence 5100.00 532,000.00 3200.00 $64.000.00 <br /> perimeter <br /> 5 1,500 SF Concrete slab/flatwork $14.00 521,000.00 59.69 314,535.00 <br /> 6 3,100 SF Mow band 511.00 534,100.00 57.84 524,304.00 <br /> 7 2 EA Pree -Fab Shade Structure wl $11,000.00 522,000.00 518,200.00 536,400.00 <br /> footing 8 install <br /> 8 3 EA Drinking fountain w/ coupler, 54,000.00 . $12,000.00 $6,000.00 518,000.00 <br /> sump <br /> 9 1 EA Water meter (private) and box 54,750.00 3.4,750.00 '32,500.00 $2,500.00 <br /> 10 920 LF Water service line (under new 514.00 512,880.00 322.40 520,608.00 <br /> gravel road) <br /> 11 1 LS Other site furniture and 522,050.00 $22,050.00 515,200.00 515,200.00 <br /> miscellaneous <br /> TOTAL BASE BID: 5238,982.00 5265,492.00 <br /> • <br /> Bid Summary-San Leandro Dog Walkup Patkkxlsx Page 7 of 8 • Printed 4113/2011© 8:39 AM <br /> • <br />