Laserfiche WebLink
• <br /> BID SUMMARY <br /> PROJECT TITLE: San Leandro Dog Walking Park . <br /> PROJECT NO.: 122-38-314 <br /> BID NO.: 10- 11.007 • <br /> BID OPENING ENGINEER'S ESTIMATE McNabb Construction, Inc. Suarez 8 Munoz Construction Redwood Engineering Const. <br /> DATE: Tuesday, April 12, 2011 Date Approved: 3/21/2011 3527 Mt. Diablo Blvd. 0306 20975 Cabot Boulevard 2336 El Camino Real <br /> TIME: 3:00 PM Prepared by MJG Lafayette, CA 94549 Hayward, CA 94545-1155 Redwood City. CA 94063 <br /> LOCATION: City Clerk Phone: 925-930-8600 . Phone: 510 - 782-6065 Phone: 925-819-2960 <br /> Fax: 925-952-4600 Fax 510-782-6078 Fax 650- 368 -9915 <br /> ITEM • <br /> NO. QUANTITY ITEM UNfT COST ITEM COST UNIT COST REM COST UNIT COST ITEM COST UNIT COST ITEM COST <br /> - <br /> 1 1 LS Mobilization (incl. general 317,702.00 317,702.00 321,000.00 321,000.00 323,000.00 323,000.00 311,000.00 511,000.00 <br /> conditions) <br /> 2 700 LF Install 6' chain link fence, Mc! 335.00 324,500.00 $42.00 329,400.00 328.00 319,600.00 330.00 321,000.00 <br /> gates/footings <br /> 3 900 LF Install 4' chain link fence, ind 340.00 $36.000.00 328.00 325,200.00 325.00 522,500.00 330.00 327,000.00 <br /> gates/footings <br /> 4 320 CY AB ArcPss Road, fence 3100.00 432,000.00 363.00 820,160.00 3127.00 340,640.00 390.00 528,800.00 <br /> perimeter <br /> 5 1,500 SF Concrete slab/ffaIwork . 514.00 $21,000.00 37.00 310,500.00 59.00 313,500.00 312.00 518,000.00 <br /> 6 3,100 SF Mow band 311,00 534,100.00 39.10 328,210.00 37.50 323,250.00 312.00 337,200.00 <br /> 7 2 EA Pree -Fab Shade Structure w/ 311,000.00 522,000.00 317,500.00 335,000.00 317,000.00 534,000.00 315,000.00 $30,000.00 <br /> footing 8 install <br /> 8 3 EA Drinking fountain wl coupler, 34,000.00 512,000.00 56,300.00 $18,900.00 35,400.00 316,200.00 37,000.00 521,000.00 <br /> sump <br /> 9 1 EA Water meter (private) and box 34, 750.00 34,750.00 58,400.00 38,400.00 32,500.00 32,500.00 • 52,000.00 32,000.00 <br /> 10 920 LF Water service line (under new 314.00 312,880.00 37.00 36,440.00 $8.00 $7,360.00 330.00 327,600.00 <br /> gravel road) <br /> 11 1 LS Other site fumiture and 322,050.00 322,050.00 321,000.00 521,000.00 $29,000.00 529,000.00 . 312,000.00 312,000.00 <br /> t miscellaneous <br /> TOTAL BASE BID: 3238,982.00 3224.210.00 3231,550.00 3235,600.00 <br /> Bid Summary-San Leandro Dog Walking Park.bsx Page 3 of 8 . • Printed 41/3/2011 4 8:39 AM <br />