Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br /> TITLE 8, Chapter 4 FISCAL YEAR 2012 PROPOSED FEES <br /> § 6.4,100: FEES. The following fees have been established by the City Council pursuant to various provisions of tho San Leandro Municipal Code (SLMC), Son Leandro Administrative Code (SLAC) or the general laws 01 the State of California. <br /> Description 1 Current Fee [Reference FY 2011 -12 Proposed Foes <br /> COMMUNITY DEVELOPMENT DEPARTMENT • ButIding Regulations Division <br /> 5 Heating, Ventilating and Air Condition or General Mechanical (Continued) <br /> Fens or dowers connected to any heating system which ere not pan al the furnace. each t 8.85 CPI <br /> 18.55 <br /> Cannon MI tango hoods, including vent, oars 532.00 t 32.45 CPI <br /> Flues: <br /> Minimum One or two flues) 59.95 t 10.10 CPI <br /> Each flue over two (each) 68.15 t 8.25 CPI <br /> Ventilating System for Kitchen, Bath. etc.: <br /> Minimum (one or two systems) 59.95 t 10.10 CPI <br /> Each system over two 18.55 t 8.65 CPI <br /> General Mechanical: <br /> incinerators - domestic, each 514.45 t 14.65 CPI <br /> Incinerates - oommertiaWldust01, each 558.70 t 57.50 CPI <br /> Garbage mutes, each <br /> Fire dampers. each 18.55 t 8.65 CPI <br /> Smog control after burners, commortialMdusbial, each system 538.55 t 39.10 CPI <br /> Refrigeration system - ccnvnefdaWloushal, each system 549.25 $ 49.95 CPI <br /> Condensate drain system, each Wet 53.75 t 3.80 CPI <br /> Boilers: <br /> To 3 h.p. each 514.95 3 75.15 CPI <br /> Over 3 to 15 hp. each 522.15 5 22.45 CPI <br /> Over 15 to 30 h,p., each 528.35 3 28.75 CPI <br /> Over 30 to 50 h,p.. each 543.05 5 43.65 CPI <br /> Over 50 h.p.. each $72.50 t 73.50 CPI <br /> Heat pumps, oath 522.15 3 22.45 CPI <br /> Cooling Systems: <br /> To 100.000 BTU each 519.55 S 19.80 CPI <br /> Over 100,000 to 500.000 BTU. each 530.75 $ 31.20 CPI <br /> Over 500,000 to 1,000,000 BTU. each 540.70 5 41.25 CFI <br /> Over 1,000,000 BTU, each 550.50 5 51.20 CPI <br /> Evaporative Cooler. Oath 520,30 S 20.60 CPI <br /> Industrial Processing Equipment: <br /> Ovens, dryers, cookers, fryers, kettles, etc each 532.05 $ 32.50 CPI • <br /> Industrial processing exhaust systems, each system 532.05 S 32.50 CPI <br /> Manufactured spray booths. each 132.05 $ 32.50 CPI <br /> Energy Co nervation: review of plans and/01 energy forms for all buildings subject to the Direct Cost (1) with a nmhirnum charge of 558.00 ...58.80 CPI <br /> California Energy Commission's conservation regulations (when not 0UVere0 by melding <br /> permit) <br /> (1) Direct Cost • hourly personnel chargo plus a factor of 100% for Mngo benefits, overhead and indirect costa <br /> G 1911OGEn2011.121FOaa12012 Pro0000d Fan Mann 9NOWN,du <br /> 13 4,27/2011 <br />