Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br /> TITLE 6, Chapter 4 FISCAL YEAR 2012 PROPOSED FEES <br /> 5 8.4,100: FEES. The following lees have been established by the City Council pursuant to various provlslone of the San Leandro Municipal Coda (SLMC), San Leandro Administrative Code (SLAG) or the general Taws of the State of California. <br /> Desert plion I Current Foe (Reference FY 2011.12 Proposed Foos <br /> FIRE SERVICE RELATED— GENERAL <br /> 1 Permits SLMC 34 -112 <br /> A. Fire Code Permit Fees 5214,00 7217.00 CPI 1.011 <br /> 2 Sprnkler Fees', SLMC 34.280 <br /> A. Undergrourd/Plivato Service Fire Main (includes plan review, hydrostatic test. flush, 8 5589.00 total 5587 plus 515/hydrant or connection fee <br /> Inspections <2 <br /> 5590.00 • $575 + $15/hydrant or connection lee based on CPI 1.011 <br /> B. Sprinkler System (system = 1 riser) (includes plan review, wel hydrostatic test 8 5589 plus 50.50 per head <br /> inspections <2 <br /> 5590.00 + 10.50 per head <br /> C. Any extraordinary situations charged at 5107.031m 5108.00MOUr CPI 1.011 <br /> D. Automatic Sprinkler Tenant Improvements: <br /> — Less than 20 heads 5214,00 5717.00 CPI 1.011 <br /> — Greater than or equal to 20 /leads 5321.00 plus 5,50 per head 5375 • 50.50 per hoed CPI 1.014 <br /> 3 Fixed Fire Protection System SLMC 3-3-250 <br /> A. Plan check, InspecWn and test 521&00 5717.00 CPI 1.014 <br /> B. Electronics activation (dean agent. quo scion. etc.) 5321.00 plus 55 per device 5325 + 50.50 per device CPI 1.014 <br /> C. Any retest or te4nspedion (I) 5107.00 *108.00 CPI 1.014 <br /> 4 F Alarms SLMC 3 -3250 <br /> A. Properly protection. plan Check and test 5214.00 plus 55 per device 5217• 55 por device CPI 1.014 <br /> 8. Lae Safety Systems 5107 plus 53Mitiating emd/a indicting device *108 • *3 Initiating and/or Indicting device CP( 1.014 <br /> C. Automatic Cbsing Fire Aswmay <br /> D. Any retest or reinspection (I) $107.008,,. 5108Reur CPI 1.014 <br /> 5 Hazardous Materials Response and Other Incident Foos SLMC 34400 <br /> A. Engine or Truck Company 5258.008v. 5262/hour CPI 1.014 <br /> 8. Deputy or Battalion Chief 598.008,,. 597 /hour CPI 1.014 <br /> B Inspection of Multiple Family Dwellings (3 or more units) CA Health & <br /> Safety Code <br /> A. Annual Annual 3107.008,, (1) $108/hr CPI 1.014 <br /> 7 Misco8aheous <br /> A. AO other plan reviews (includes review and ordinary inspections associated with project) 521400 pion 65% of big permit fee(2) 5717 • 565% of 0109 permit foe (7) CPI 1.014 <br /> B. Other Fire Prevention Services (includes any miscellaneous tie protection mimeo Dirac Cost (2) (3) <br /> activities not otherwise categorized in this fee 'checWO) <br /> C. Fire Imertpation Fee 5535 5542.00 CPI 1.014 <br /> D. Planning Review Fee (Site plans 8 CUP) 5214 5217.00 CPI 1.014 <br /> (1) 1 hour minimum <br /> (2) The City Manager and/or Fire Chief may adjust the plan chocking/permit loo for an Individual project when costs to the City are 1101 congruent with this fee schedule. <br /> ( Direct Cost • hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs. <br /> 0 \BUO3En201I - 12 sso2012 Rcppeed Fm Yarbe Schedule. do 25 40712011 <br />