Laserfiche WebLink
CITY OF SAN LEANDRO <br /> APPROVED AND <br /> STAFF REPORT FORWARDED <br /> TO CITY COUNCIL <br /> DATE: May 16, 2011 �� /7 <br /> S L. Hollister <br /> TO: Stephen L. Hollister, City Manager City Manager <br /> FROM: Uchenna Udemezue, Director <br /> Engineering and Transportation rtment <br /> BY: Kenneth Joseph, City Engineer <br /> Engineering and Transportation Departme <br /> • <br /> SUBJECT PROJECT /PROJECT DESCRIPTION: <br /> RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND CALLING FOR BIDS <br /> FOR THE 14901 EAST 14 STREET DEMOLITION PROJECT, PROJECT NO. 11- 962 -39- <br /> 001. <br /> SUMMARY AND RECOMMENDATION • <br /> The subject project will remove the existing building and other structures as the first step in site <br /> preparation before construction of intersection improvements. Staff recommends approval of <br /> plans and specifications and call for bids for the subject project. <br /> BACKGROUND <br /> In 1997 the City identified the intersection of East 14 Street/Hesperian Boulevard/150` <br /> Avenue, known as "The Triangle ", as an area requiring improvement to reduce traffic congestion <br /> and improve safety. In 2002, this project was approved as part of the Alameda County <br /> Transportation Authority (ACTIA) Measure B 1/2 -cent tax reauthorization program. <br /> The primary improvements will include: 1) widen East 14 Street at 150 Avenue to add an <br /> additional eastbound left turn lane; 2) add a dedicated southbound left turn lane on. Bancroft <br /> Avenue at East 14 Street; and 3) install dual northbound left turn lanes on I-Iesperian,Boulevard <br /> at East 14 Street. <br /> Additional right of way is required to perform these improvements. In 2009, the former gas <br /> station located at 14901 East 14 Street, currently operating as a Quality Tune -up Shop, was <br /> acquired by the Redevelopment Agency. The Redevelopment Agency then entered into a <br /> month -to -month lease agreement with the tenant that allowed them to stay until the project is <br /> ready to move forward. <br />