Laserfiche WebLink
BID SUMMARY . <br /> E k.,--70--- i\t , vl.:4,04:A.11.,,, <br /> � w � a r is Y ki �T <br /> l 1n . ::•;:::;14.L.-...0. 1 tM� j> pp . :. <br /> PROJECT TITLE: San Leandro Blvd (SLB)/Davis St Sewer Capacity Improvemr <br /> PROJECT NO.: 10. 593.62 -247 <br /> BID NO.: 10- 11.008 <br /> BID OPENING ENGINEER'S ESTIMATE Shaw Pipeline, Inc: JW Ebert Corp. <br /> DATE: Tuesday, April 19, 2011 Date Approved: 3/151/2011 150 Executive Park Blvd., ono 1620 So. 7th Street <br /> TIME: 3:00 PM Prepared by: NNC San Francisco, CA 94134 San Jose, CA 95112 <br /> LOCATION: City Clerk • Phone: 415-337-0190 Phone: 408. 297.1031 <br /> Fax: 415-337-6245 Fax: 408 -287 -4576 <br /> ITEM - • <br /> NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br /> 1 1 LS Mobilization 523,250.00 523,250.00 525,000.00 $25,000.00 513,389.00 513,389.00 <br /> 2 1 LS Traffic Control and Conslrutlon 525,000.00 525,000.00 55,000.00 55,000.00 519,571.00 $19,571.00 • <br /> Area Signs <br /> 3 800 LF 18" Sanitary Sewer Pipe 5250.00 $225,000.00. 5283.00 5254,700.00 5268.00 8239,400.00 <br /> 4 4 EA Type ASSMH $11,000.00 544,000.00 54,500.00 516,000.00 511,074.00 544,296.00 <br /> 5 1 EA Drop Connection at new SSMH •55,000.00 $5,000.00 55,000.00 55.000.00 $1,381.00 51,361.00 <br /> 6 385 LF Grout 6" diameter pipe $50.00 510,250.00 513.00 55,005.00 516.00 56,160.00 <br /> 7 1 LS Roadway Striping 52,000.00 $2,000.00 511,000.00 511,000.00 512,741.00 512,741.00 <br /> 8 1 LS Sheeting, Shoring and Bracing 515,000.00 515.000.00 510,000.00 510,000.00 58,178.00 $8,178.00 <br /> 9 490 TON PermentAC Paving 5100.00 549,000.00 5180.00 588,200.00 8302.00 8147,980.00 <br /> 10 1.350 TON Hauling and Disposal of Class 1 530.00 540,500.00 5110.00 $148,500.00 $117.00 5157,950.00 <br /> Trench Spoils ' <br /> 11 8 LF 6" VCP Sanitary Sewer.Pipe $100.00 5800.00 $200.00 $1.600.00 5318.00 52,544.00 <br /> 12 15 LF 12' Sanitary Sewer Pipe 5130.00 $1,950.00 5200.00 53,000.00 $386.00 $5,790.00 <br /> 13 1,350 TON Hauling and Disposal of Class 2 $40.00 554,000.00 538.00 548,600.00 533.00 544,550.00 <br /> Trench Spoils <br /> 14 30 LF Permanent Portland Concrete 550.00 $1,500.00 $50.00 51,500.00 5103.00 53,090.00 . <br /> Curb <br /> 15 50 SF Permanent Portland Concrete $20.00 $1,000.00 515.00 $750.00 $74.00 $3,700.00 <br /> Flatwork <br /> 16 1 EA Demo•Manhote Per Section 306- 56,000.00 56,000.00 5500.00 5500.00 51,871.00 51,671.00 <br /> 5 of Contract Specs <br /> 17 80 SF Repair Duratherm per Exhibit A 512.50 $1,000.00 • $30.00 52,400.00 $34.00 52,720.00 <br /> at Station -5 +65 to -5 +77 <br /> San Leandro Blvd-Davis St Sewer Capady Improvementa.Phase Lxlsx Page 7 of 8 Printed 4/18/2011 @ 4:27 PM <br />