BID SUMMARY
<br /> 6 yy ioin�"t� . . i
<br /> ti kr�oit : F' n
<br /> AIT �i 11
<br /> NL �I .
<br /> 1.L r
<br /> •... v . „t: :1 ; _ ,. X _qK � f Thls document Is a summary of bids received for the subject project and are
<br /> provided only as a convenience. Listing of a particular bid is not a finding that such
<br /> bid has been found to be responsive or accepted as comptoto by the City. An award •
<br /> of contract, If any, is subject to approval of the City Council and /or the City Manager.
<br /> Contractors should refer to the contract documents for bidding information.
<br /> PROJECT TITLE: San Leandro Blvd (SLB)/Davls St Sewer Capacity Improvements-Phase I
<br /> PROJECT NO.: 10- 693 -52 -247
<br /> BID NO.: 10- 11.008 .
<br /> BID OPENING ENGINEER'S ESTIMATE Andes Construction, Inc. WR Fords Associates Legg, Inc.
<br /> DATE: Tuesday, April 19, 2011 Date Approved: 3/16/2011 5305 E. 12th Street 984 Hensley Street 2551 2nd Street
<br /> TIME: 3:00 PM Prepared by: NNC Oakland, CA 94601 Richmond, CA 94801 Livermore, CA 94550 .
<br /> LOCATION: City Clerk Phone: 510 - 536 -7832 Phone: 510 - 215 -9338 Phone: 925-605-4500
<br /> Fox: 510 -538 -7834 Fax: 510-215-9867 Fax: 925-605-4510
<br /> ITEM '
<br /> NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST . UNIT COST ITEM COST UNIT COST ITEM COST
<br /> 1 1 LS Mobilization 323,250.00 523,250.00 525,000.00 525,000.00 810,000.00 510,000.00 $21,311.30 521,311.30
<br /> 2 1 LS Traffic Control and Construtlon $25,000.00 525,000.00 510,000.00 $10,000.00 $14,000.00 514,000.00 $17,137.96 517.137.96
<br /> Area Signs
<br /> 3 800 LF 18" Sanitary Sewer Pipe 5250.00 5225,000.00 5300.00 8270,000.00 5199.00 5179.100.00 $108.44 $97.596.00
<br /> 4 4 EA Type A SSMH 511,000.00 544,000.00 84,000.00 516,000.00 $8,000,00 332,000.00 59,416.47 $37,665.88
<br /> 5 1 EA Drop Connection at new SSMH 55,000.00 55,000.00 $1,500.00 31,500.00 $1,500.00 $1,500.00 82,778.28 52,778.28
<br /> 8 385 LF Grout 6" diameter pipe $50.00 519,250.00 51.00 $385.00 511.00 54,235.00 $26.41 510,167.85
<br /> 7 1 LS Roadway Striping 52,000.00 52,000.00 52,500.00 52,500.00 58,500.00 58,500.00 518,664.53 518,664.53
<br /> 6 1 LS Sheeting, Shoring and Bracing $15,000.00 515,000.00 310,000.00 510,000.00 55,000.00 $5,000.00 527,356.98 327,356.98
<br /> 9 490 TON Perment AC Paving $100.00 $49,000.00 ' 5135.00 568,150.00 898.00 548,020.00 $164.95 $80,825.50
<br /> 10 1.350 TON Hauling and Disposal of Class 1 $30.00 $40,500.00 $10.00 $13,500.00 $100.00 5135,000.00 $102.43 $138,280.50
<br /> Trench Spoils
<br /> 11 8 LF 6" VCP Sanitary Sewer Pipe $100.00 $800.00 $125.00 51,000.00 5150.00 $1,200.00 $363.59 52,908.72
<br /> 12 15 LF 12" Sanitary Sewer Pipe $130.00 51,850.00 5151.00 ' 52,285.00 5150.00 52,250.00 8256.18 53,842.70
<br /> 13 1,350 TON Hauling and Disposal of Class 2 $40.00 554,000.00 81.00 51,350.00 530.00 $40,500.00 $30.91 541,728.50
<br /> • Trench Spoils
<br /> 14 30 LF Permanent Portland Concrete $50.00 $1,500.00 $17.00 8510.00 540.00 51,200.00 591.11 52,733.30 •
<br /> Curb
<br /> 15 50 SF Permanent Portland Concrete 520.00 51,000.00 515.00 5750.00 512.00 5600.00 563.71 $3.185.50
<br /> Flatwork
<br /> 16 1 EA Demo Manhole Per Section 306- $6,000.00 $6,000.00 $2,500.00 52,500.00 53,500.00 53,500.00 ' $7,101.41 $7,101.41
<br /> 5 of Contract Specs
<br /> 17 80 SF Repair Duratherm per Exhibit A 512.50 51,000.00 520.00 51,600.00 529.00 82,320.00 870.00 . $5,600.00
<br /> at Station -5 +65 to -5 +77
<br /> San Leandro Blvd -Davis SI Sewer Capacity Improvements -Phase I.xlsx Page 1 018 Printed 4/19/2011 CO 4:27 PM