Laserfiche WebLink
• <br /> BID SUMMARY • <br /> • <br /> S W /(4 7 I tv`i.:i 'lk: At <; :i:;6!/ • <br /> -6 Y ; <br /> M' �IYU <br /> * , <br /> • <br /> PROJECT TITLE: San Leandro Blvd (SLB) /Davis St Sewer Capacity Improver/1r <br /> PROJECT NO.: 10. 693-62-247 <br /> BID NO.: 10- 11.008 <br /> BID OPENING • ENGINEER'S ESTIMATE J8m, Inc. California Trenchless, Inc. Redwood Engineering Const. <br /> DATE: Tuosday, April 19, 2011 Date Approved: 3/16/2011 6700 National Drive - 2283 Dunn Road 2336 El Camino Real <br /> TIME: 3:00 PM Prepared by: NNC Livermore, CA Hayward, CA 94545 Rewood City, CA 94063 <br /> LOCATION: City Clerk Phone: 925 - 724.0300 Phone: 510-782-5335 Phone: 925-819-2960 <br /> . Fax: 925-724-0160 Fax: 510-266-1543 Fax: 650-380-9915 <br /> ITEM <br /> NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br /> 1 1 LS Mobilization 323,250.00 323,250.00 521,400.00 321,400.00 325,000.00 , $25,000.00 320,000.00 120,000.00 <br /> 2 1 LS Traffic Control and Constiution 325,000.00 125,000.00 313,900.00 313,900.00 315,000.00 315.000.00 529,000.00 129,000.00 <br /> Area Signs <br /> 3 900 LF 18" Sanitary Sewer Pipe $250.00 3225.000.00 3163.00 3148,700.00 5357.00 $321,300.00 $140.00 3126,000.00 <br /> 4 4 EA Type A SSMH 311,000.00 344,000.00 35,781.00 523,124.00 14,500.00 $18,000.00 18,000.00 124,000.00 _ <br /> 5 1 EA Drop Connection at new SSMH $5,000.00 15,000.00 31,776.00 31,776.00 $5,000.00 15,000.00 $1,000.00 $1,000.00 <br /> 6 385 LF Grout 6" diameter pipe 150.00 119,250.00 324.00 19,240.00 120.00 $7,700.00 $20.00 37,700.00 ' <br /> 7 1 LS Roadway Striping 32.000.00 12,000.00 16,636.00 36,636.00. 36,500.00 16,500.00 16,500.00 36,500.00 <br /> 8 1 LS ' Sheeting, Shoring and Bracing 115,000.00 515,000.00 310,494.00 310,494.00 115,000.00 315,000.00 17.500.00 37,500.00 <br /> 9 490 TON Perment AC Paving $100.00 349,000.00 $159.00 $77,910.00 $150.00 373,500.00 1200.00 398,000.00 <br /> 10 1,350 TON Hauling and Disposal of Class 1 330.00 340,500.00 373.00 398,550.00 35.00 36,750.00 3130.00 3175,500.00 <br /> Trench Spoils <br /> 11 8 LF 6" VCP Sanitary Sewer Pipe 3100.00 3800.00 $640.00 35,120.00 3285.00 32,280.00 3250.00 32,000.00 <br /> 12 15 LF 12" Sanitary Sewer Pipe 3130.00 $1,950.00 $568.00 38,520.00 3390.00 $5,850.00 5300.00 34,500.00 <br /> 13 1,350 TON Hauling and Disposal of Class 2 $40.00 $54,000.00 373.00 398,550.00 315.00 320,250.00 $35.00 347,250.00 <br /> Trench Spoils <br /> 14 30 LF Permanent Portland Concrete 350.00 31,500.00 322.50 3675.00 $50.00 31,500.00 350.00 31,500.00 <br /> Curb <br /> 15 50 SF Permanent Portland Concrete 120.00 31,000.00 327.50 31,375.00 $25.00 31,250.00 160.00 33,000.00 <br /> Flatwork <br /> 18 1 EA Demo Manhole Per Section 306- 36,000.00 36,000.00 34,488.00 34,488.00 34,500.00 34,500.00 $1,500.00 31.500.00 <br /> 5 of Contract Specs <br /> 17 80 SF Repair Duratheml per Exhibit A 312.50 31,000.00 333.00 32,840.00 550.00 34,000.00 $40.00 33,200.00 <br /> at Station -5 +85 to -5 +77 <br /> San Leandro Blvd-Doyle St Sewer Capacity Improvements -Phase Wax Page 3 of 8 Printed 4119//2011 © 4:27 PM <br />