Laserfiche WebLink
• <br /> BID SUMMARY <br /> • <br /> d<y.Nk iy a .5: 4 k. > <br /> CVO' l)'. W' \4 -: Y. <br /> • <br /> • <br /> PROJECT TITLE: San Loandro Blvd (SLB)IDavls St Sewer Capacity ImprovemE <br /> PROJECT NO.: 10- 693 - 52.247 <br /> BID NO.: 10- 11.008 <br /> BID OPENING ENGINEER'S ESTIMATE Platinum Pipeline, Inc. D'Arcy & Harty Construction, Inc.. Precision Engineering, Inc. <br /> DATE: Tuesday, AprIl 19, 2011 Date Approved: 3116/2011 P. O. Box 2429 1300 Carroll Avenue 92 Natoma Street, #209 . <br /> TIME: 3:00 PM Prepared by: NNC Dublin, CA 94568 San Francisco, CA 94124 San Francisco, CA 94105 <br /> LOCATION: City Clerk Phone: 925-829-6565 Phone: 415 -822 -5200 Phone: 415 -621 -4882 <br /> Fax: 925. 829.7575 Fax: 415- 822 -0747 Fax: 415. 821 -4812 <br /> ITEM <br /> NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br /> 1 1 LS Mobilization 523,250.00 523,250.00 510,000.00 510,000.00 • 525,000.00 525,000.00 550,000.00 550,000.00 <br /> 2 1 LS Traffic Control and Conslrulion 525,000.00 325,000.00 53,000.00 53,000.00 517,000.00 517,000.00 530,000.00 530,000.00 <br /> Area Signs <br /> 3 800 LF 18" Sanitary Sewer Pipe 3250.00 $225,000.00 5240.00 $216,000.00 5213.00 5191,700.00 5350.00 5315,000.00 <br /> 4 4 EA , Type A SSMH $11,000.00 544,000.00 57,000.00 $28,000.00 58,500.00 $34,000.00 37,500.00 $30,000.00 <br /> 5 1 EA Drop Connection at new SSMH 55,000.00 $5,000.00 54,000.00 54,000.00 53,000.00 53,000.00 $5,000.00 55,000.00 <br /> 6 385 LF Grout 6" diameter pipe 550.00 319,250.00 510.00 53,850.00 510.00 53,850.00 520.00 57,700.00 <br /> 7 1 LS Roadway Striping 52,000.00 52,000.00 58,000.00 58,000.00 55,000.00 55,000.00 510,000.00 510,000.00 <br /> 8 1 LS Sheeting, Shoring and Bracing 515,000.00 515,000.00 34,000.00 54,000.00 535,000.00 335,000.00 550,000.00 550,000.00 <br /> 9 490 TON Raiment AC Paving 5100.00 $49,000.00 5160.00 $78,400.00 5130.00 563,700.00 5150.00 573,500.00 <br /> 10 1,350 TON Hauling and Disposal of Class 1 530.00 $40,500.00 $110.00 $148,500.00 $90.00 5121,500.00 55.00 56,750.00 <br /> Trench Spoils <br /> 11 8 LF 6" VCP Sanitary Sewer Pipe 3100.00 $800.00 5400.00 53,200.00 5300.00 32,400.00 5300.00 52,400.00 <br /> 12 15 LF 12" Sanitary Sewer Pipe 5130.00 51,950.00 $400.00 58,000.00 5250.00 53,750.00 5300.00 34,500.00 <br /> 13 1,350 TON Hauling and Disposal of Class 2 540.00 554,000.00 335.00 547,250.00 545.00 560,750.00 55.00 58,750.00 <br /> Trench Spoils <br /> 14 30 LF Permanent Poritand Concrete 350.00 51,500.00 560.00 $1,800.00 340.00 51,200.00 $25.00 $750.00 <br /> • <br /> Curb <br /> 15 50 SF Permanent Portland Concrete 520.00 51,000.00 540.00 52,000.00 512.00 5600.00 510.00 $500.00 <br /> Flatwork <br /> 16 1 EA Demo Manhole Per Section 306 - $6,000.00 56,000.00 31,000.00 51,000.00 33,000.00 53,000.00 52,500.00 52,500.00 <br /> 5 of Contract Specs <br /> 17 80 SF Repair Duralherm per Exhibit A , 512.50 51,000.00 360.00 34,800.00 540.00 $3,200.00 320.00 81,600.00 <br /> at Station -5 +65 10 -5+77 <br /> San Leandro Blvd -Davis SI Sewer Capacity Improvements -Phase I.xlsx Page 5 of 8 Printed 4/192011 0 4:27 PM <br />