Laserfiche WebLink
ENGINEER'S COST OPINION <br /> FOR <br /> Knight Memorial at Marina Park <br /> PROJECT N/A <br /> ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT <br /> 1 Sidewalk 160 SF $15.00 S2,400.00 <br /> 2 Bench with intergral plaque 1 EA 51,000.00 $1,000.00 <br /> 3 Drinking Fountain 1 EA $4,000.00 S4,000.00 <br /> Separate Plaque 21 x 18 Not Included in total 1 EA $2,500.00 <br /> SUBTOTAL CONSTRUCTION 57,400.00 <br /> Permit Fees, Utility Costs, other Misc Fees ( Incl. BCDC) $250.00 <br /> Contingencies Percentage:1 25% 1,850.00 <br /> Design 0.00 <br /> Construction Engineering, Inspection & Admin. 1,000.00 <br /> TOTAL ESTIMATED PROJECT COST (BASF BIDI $10.500.00 <br /> BUDGET INFORMATION Account Number (s) Amount <br /> Designated Funds Available: TBD <br /> TOTAL FUNDING $0.00 <br /> By: 1 Date Prepared: 2 -Mar -11 <br /> Cost Estimate Purpose: Conceptual <br /> Reviewed: Date: <br /> Austine Osakwe, P.E., Senior Engineer <br /> Approved: Date: <br /> Kenneth Joseph, P.E., City Engineer <br /> • <br /> • <br /> Knight Memorial Cost Estimatcalss 4/12/2011 <br />