Laserfiche WebLink
Thousand Dollars ($400,000.00) to cover the cost of plan review and inspection of the improvements. <br />Owner hereby agrees to increase the amount of the deposit to pay City the actual cost of inspection if such <br />costs should exceed the original deposit. <br />4. Modification for Unforeseeable Circumstances Owner reserves the right to modify said <br />plans and specifications as the development progresses should unforeseen conditions occur, providin; <br />written approval is first obtained from the City Engineer The City shall bear no responsibility whatsoever <br />for work performed and rejected by the City Engineer. City reserves the right to make reasonable <br />modifications to the plans and specifications whenever field conditions and/or public safety require such <br />modifications. Owner shall pay 'City for all costs incurred in plan checking and inspection resulting from <br />said modifications. <br />5. Work: Time for Commencement and Performance City hereby fixes the time for the <br />commencement of the required work to be on or before the V day of August 2011, and for its completion to <br />be on the 1" day of October, 2013. At least 15 calendar days prior to the commencement of work <br />hereunder, Owner shall notify the City Engineer in writing of the date fixed by Owner for commencement <br />thereof, in order that the City Engineer shall be able to provide services for inspection. <br />6. Location of Construction Yard Owner agrees to locate any construction yard for the <br />storage of equipment, vehicles, supplies and materials, or the preparation or fabrication thereof, to be used <br />in connection with the installation of improvements for said project or the construction of buildings therein, <br />in such a manner so as to cause a minimum of inconvenience to persons living in the areas immediately <br />adjacent to said project, including installation of appropriate fencing and screening, and to obtain the <br />approval of the City Engineer as to the proposed location and standards of maintenance of the yard. <br />hnmediately upon completion of the improvements to be constructed to which this agreement refers, Owner <br />agrees to cease using the construction yard, clear the site and restore it to its original condition, and to <br />remove therefrom all supplies, materials, equipment, or vehicles being stored or kept thereon. Owner agrees <br />not to use the construction yard in connection with the installation of improvements or construction of <br />STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 2 of 13 <br />G:\ Blvd 1701 (Kaiser) \Off site improvement plans\Public Improvement Agreement 2500 Merced.doc <br />