My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent 2011 0620
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0620
>
8L Consent 2011 0620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2011 5:16:04 PM
Creation date
6/16/2011 4:31:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/20/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0620
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0620
Reso 2011-127
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
buildings elsewhere. City may extend the time within which the construction yard may be used or within <br />which supplies, materials, equipment or vehicles may be stored or kept thereon if City shall determine that <br />the granting of such extension will not be detrimental to the public welfare. No extension will be made <br />except on the basis of a written application made by Owner to the City Engineer stating fully the grounds <br />and facts relied upon for such extension. <br />7. Rights -of -Way Free From Obstruction Owner agrees to keep and maintain all areas <br />within the improved or partially improved public streets or public rights -of -way contiguous and adjacent to <br />and within the hereinabove referred to Property, including streets being constructed and/or improved <br />pursuant to this agreement, free and clear of all building materials, dirt, mud, sand, gravel, rocks, bricks, <br />stones, shingles, roofing material, lumber, tool sheds, construction buildings and other similar items at all <br />times during the improvement and construction of the improvement and all buildings and other structures <br />within said project. <br />8. Extension The dates for commencement and completion of the work of construction may <br />be extended as herein provided. The City Engineer shall extend said dates for delays in said work actually <br />caused by riots, strikes, lockouts, fires, earthquakes, flood and conditions resulting therefrom. Extension of <br />said dates for any other cause shall be made only by the City Engineer. The City Engineer shall be the sole <br />and final judge as to whether good cause has been shown to entitle Owner to an extension. Any extension <br />granted pursuant to this paragraph shall not obligate City in any manner to grant other requests for <br />extension. <br />9. Request for Extension; Granting Any request for extension of any commencement and <br />completion date shall be in writing, shall fully state the facts and grounds relied upon for said extension, and <br />shall be delivered to City in the manner hereinafter specified for services of notices. Extensions shall be <br />granted in writing and any purported oral extension or purported oral agreement to make an extension shall <br />not be valid for any purpose whatsoever. <br />STANDARD PUBLIC IMPROVEMENT AGREEMENT Page 3 of 13 <br />G:\ Blvd 1701 (Kaiser)1Off site improvement plans\Public Improvement Agreement 2500 Merced.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.